Similar Projects
West Boise Water Renewal Facility (WBWRF) Maintenance Building - North Restroom Addition
Addition
Post-Bid
$300,000 est. value
Boise, ID 83714

Chatcolet Restroom Replacement at Heyburn State Park
New Construction
Results
$125,000 est. value
Plummer, ID 83851

Remodel Marina Restroom at Hells Gate State Park
Renovation
Post-Bid
$100,000 est. value
Lewiston, ID 83501

Repair Shower House, Priest Lake State Park
Renovation
Results
Coolin, ID 83821

Concrete Vault Restroom
New Construction
Bidding
$170,000 est. value
Boise, ID

Fort Boise Restroom Completion
Renovation
Results
Boise, ID 83702

CXT Restroom Relocation
New Construction
Results
$150,000 est. value
Meridian, ID

Idaho Community Development Block Grant
New Construction, Infrastructure
Results
$175,174 est. value
Moscow, ID 83843

Kendrick High School Concessions and Locker Room
Renovation, Addition, Alteration
Post-Bid
Kendrick, ID

Lake Walcott State Park - Boat Ramp Restroom Repair
Renovation
Results
$75,000 est. value
Rupert, ID 83350

Julia Davis Park Restroom and Pavilion
Renovation
Results
$700,000 est. value
Boise, ID 83702

Rhodes Skate Park Restroom
Renovation
Post-Bid
Boise, ID 83702

Last Updated 07/19/2022 02:34 AM
Project Title

Iron Lake Toilet Replacement Project - Salmon Challis National Forest

Physical Address View project details and contacts
City, State (County) Shoup, ID 83469   (Lemhi County)
Category(s) Entertainment/Recreation
Sub-Category(s) Restroom/Bath House
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $25,000 to $100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is to replace existing two single-vault toilets with one double-vault toilet at Iron Lake Campground. Work includes, but is not limited to, arranging to have existing toilets pumped empty prior to removal; removing and disposing of existing toilet buildings and vaults; excavating and preparing the sites for a new vault toilet; and backfilling and compacting around the new vault after placement. The contractor is responsible for coordinating toilet replacement with the pre-cast concrete toilet manufacturer. The manufacturer is responsible for delivery, placement, and assembly of the new toilet. The Government will stake the locations of the new toilet to establish their orientation to assure proper functioning. The new building will be at the same location as the existing facility. Site for toilet replacement is at the Iron Lake Campground in the Salmon-Challis National Forest. Material source is the Summit Pit near Williams Summit. See the Project Location Map for precise information on locations

Details

Restroom/Bath House, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents