Last Updated | 07/29/2022 11:07 AM |
Project Title | NRL-A59 Roof Repairs (Roofing MACC) |
Physical Address | View project details and contacts |
City, State (County) | Washington, DC 20032 (District of Columbia County) |
Category(s) | Government/Public, Laboratory, Single Trades |
Sub-Category(s) | Laboratory, Military Facility, Roofing |
Contracting Method | Competitive Bids |
Project Status | Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $1,000,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Small Business Roofing Multiple Award Construction Contract (ROOFING MACC) NAVFAC WASHINGTON PROPOSED TASK ORDER: NAVAL RESEARCH LABORATORY- BUILDING ROOF REPAIR, BLDG. A59, NAVAL RESEARCH LABOROATRY, WASHINGTON, DC. Proposed Task Order: N40080-19-R-4592 5935232 Estimated Price Range: In accordance with FAR 36.204, Disclosure of the Magnitude of Construction Projects, the estimated price of this construction project is between $500,000 and $1,000,000. Secure work site. Survey and inspect the entire roofing system including missing and damaged vent caps. Repair leaks as necessary. Replace missing or damaged vent caps. Repair/replace rubber seals along seams. Replace gutters and downspout connections. Tighten loose fasteners. Install primer and coating on seams and flashing areas. Repair and modify the roof expansion joint to ensure watertight construction. The Contractor shall ensure roof is watertight at end of each workday. The Contractor shall provide a detailed fall protection plan, detailed work plan, including access to roof, impact on pedestrian traffic/control and restoration of work area. Before beginning any demolition or deconstruction work, survey the site and examine the drawings and specifications to determine the extent of the work. Contractor shall establish a fall protection and prevention program, for the protection of all employees exposed to fall hazards. As the facility is currently occupied, proper sequencing of work shall ensure the safe relocation of occupants prior to start of work. Repair all incidental damage caused to the building during the repairs. All work shall be performed in accordance with NAVFAC and OSHA safety standards. All work shall meet applicable mechanical and building codes. Ensure to clean area and remove all debris and removed materials from work site. Ensure to properly dispose of any hazardous material. Estimated Price Range: In accordance with FAR 36.204, Disclosure of the Magnitude of Construction Projects, the estimated price of this construction project is between $500,000 and $1,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |