Similar Projects
Chiller Maintenance Services
Infrastructure
Design
Detroit, MI 48201

HVAC Repairs and Maintenance
Term Contract
Sub-Bidding
Detroit, MI 48202

HVAC Maintenance and Repair Service
Alteration
Post-Bid
Highland Park, Livonia, Taylor, Wayne, MI 48180

Air Filters for Powerhouse
Term Contract
Post-Bid
Dearborn, MI

CDBG Emergency Furnace Replacement
Results
Taylor, MI 48180

Heating and Cooling Services
Alteration
Results
River Rouge, MI 48218

A/C in the Middle School
Alteration
Post-Bid
Harper Woods, MI

Classroom Ceiling Fan Replacement Monteith Elementary School
Alteration
Results
Grosse Pointe Woods, MI 48236

FPM - Beecher House HVAC Improvements - 2021
Alteration
Post-Bid
Detroit, MI 48202

Chiller Compressor Replacement Grosse Point North High School
Alteration
Results
Grosse Pointe, MI

Mystic Creek Air Conditioning
Alteration
Post-Bid
Dearborn, MI

HVAC Revisions – Keidan Special Education Center, Burton Academy, and Davison Annex
Alteration
Results
Detroit, MI 48204

Emergency Restoration Services
Term Contract, Alteration
Post-Bid
MI

HVAC Revisions -Central High School and Moses Fields
Alteration
Results
Detroit, MI 48214

BP 2 Allen Park High School and Middle School AC Install
Alteration
Post-Bid
Allen Park, MI 48101

Last Updated 12/13/2022 03:21 PM
Project Title

Elkay Filling Stations w/Single ADA Cooler

Physical Address View project details and contacts
City, State (County) Garden City, MI 48135   (Wayne County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Scope Of Work Garden City Public Schools is seeking highly qualified/experienced contractor to provide and install 33 new Elkay LZS8WSLK EZH2O Filling Stations with single ADA cooler, filtered, 8 GPH, light gray, commercial water bottling stations and or similar District preapproved units. This work will include the removal and disposal of the existing drinking fountains, any electrical and plumbing modifications needed to ensure units are operational and compliant along with repairing any wall imperfections left visible from the previous fountain or from installation of the new bottling stations. Contractor must supply the new bottle filling stations, tools and other equipment necessary for the performance and completion of the scope of work General Requirements Security: o All Facilities must remain and be left securely locked. o No exterior doors will be propped open Personnel: o Only authorized employees of the vendor are allowed in facilities at any time. o All such employees must be working while at the school. o No children will be allowed to accompany employees. o Contractor must be able to provide proof that personnel meet all Federal and State Labor Laws and requirements. o A minimum of one worker must be able to communicate in English and must be able to read messages in English. Damage: o Contractor will be responsible for any damage done to school property including personal belongings within the facility by contactors personnel, or their subcontractors. Any such damage will be repaired or replaced at the contractors expense and to the satisfaction of Garden City Public Schools. Work Schedule: o A specific work schedule must be agreed upon and adhered to. Any alterations must be approved by our district representative, Neil Greene Questions and request for clarification related to this RF should be in writing to greenen@gardenctiyschools.com no later than December 7, 2022. Responses will be emailed to all respondents no later than December 9, 2022. Bid Proposals shall be submitted as set forth in Paragraph 3, above. If you experience any issues, please reach Neil Greene, greenen@gardencityschools.com Bid to include Bid Bond, Iran Sanctions Form, Familial Disclosure Form listed in the shared folder. 3.1. Because Work on this Project is covered by the Michigan Prevailing Wage Act ("Act") and the Davis-Bacon Act, the Contractor and its subcontractors and other Subordinate Parties that are governed by the applicable prevailing wage law shall pay all hours at the prevailing wage rates at the applicable hourly rate; no Work performed by or on behalf of the Contractor on this Project will be paid on a lump sum basis or a piece rate basis in violation of the Act or the Davis-Bacon Act, as applicable. 3.2. The Contractor will pay its workers at wage and fringe benefit rates consistent with the Act or the Davis-Bacon Act regardless of whether the workers are classified as employees or independent contractors. 3.3. The Contractor shall not misclassify any work assignments, but shall in each and every case follow proper jurisdictional assignments in compliance with the Act or the Davis-Bacon Act, as applicable.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents