Similar Projects
Health Department Addition and Alterations
Addition, Demolition, Renovation, Infrastructure
Design
$3,000,000 CJ est. value
Martinsburg, WV 25403

Path Improvements
Infrastructure
Design
$496,000 est. value
Barboursville, WV

Inwood-Tabler Station
Infrastructure
Bidding
$575,000 CJ est. value
Inwood, WV 25428

Berkeley County Dunn Building Addition and Renovations
Addition, Demolition, Renovation, Infrastructure
Bidding
$450,000 CJ est. value
Martinsburg, WV 25401

Lighting - Flatwoods
Infrastructure
Sub-Bidding
$2,000,000 CJ est. value
Flatwoods, WV 26621

I-64 Exit 181 Wb Cantilever Sign Structure
Infrastructure
Sub-Bidding
$4,000,000 CJ est. value
Lewisburg, WV 24901

Post-Harvest Site Preparation Services
Alteration
Post-Bid
Durbin, WV 26264

Post-Harvest Site Preparation Services
Alteration
Post-Bid
Durbin, WV 26264

Site Development - Facility Expansion Project
Results
Summit Point, WV

Raymond Stoaks Plaza Revitalization Plan
Infrastructure
Results
Follansbee, WV

Discount Tire
New Construction - 10,903 SF
Construction
Martinsburg, WV

Meadow River Trail Russellville Bridge Replacement
Demolition, New Construction, Infrastructure
Construction
$981,245 CJ est. value
Fayetteville, WV 25840

Martinsburg Land Warehouse
New Construction, Infrastructure
Pending Verification
$108,000,000 CJ est. value
Inwood, WV 25428

Nucor Sheet Steel Plant
New Construction, Infrastructure
Pending Verification
$2,700,000,000 CJ est. value
Weirton, WV 26062

Menards - Charles Pointe Crossing / Bridgeport
New Construction, Infrastructure - 200,000 SF
Design
$12,000,000 CJ est. value
Bridgeport, WV 26330

Last Updated 12/06/2022 06:49 PM
Project Title

Bluestone Travel Plaza - West Virginia Parkways Authority

Physical Address View project details and contacts
City, State (County) Princeton, WV 24740   (Mercer County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Gas Station, Site Development, Vehicle Sales/Service
Contracting Method Competitive Bids
Project Status Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $50,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for a new Bluestone Travel Plaza As of December 6, 2022, information regarding a design team or a general contractor is not available. Construction is anticipated to begin in February 2023 and be completed by the end of 2024. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Metal Doors and Frames, Panel Doors.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 22 - Plumbing, Facility Water Distribution, Facility Storm Drainage.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents