Similar Projects
University of Saint Thomas STEAM Complex
New Construction - 130,000 SF
Conception
$100,000,000 est. value
Saint Paul, MN 55105

Herb Brooks National Hockey Center Ice Plant and Lighting Replacement
Renovation
Design
Saint Cloud, MN 56301

Ancillary Products Pillsbury Hall Rehabilitation
Renovation
Post-Bid
Minneapolis, MN 55455

System Furniture Pillsbury Hall Rehabilitation
Renovation
Post-Bid
Minneapolis, MN 55415

LSC Hawks Landing Student Lounge
Renovation - 3,500 SF
Results
Duluth, MN 55811

Infrastructure Replacement
Renovation
Results
Less than $30,000,000 est. value
Duluth, MN 55804

Rasmussen University Higher Education Building
New Construction - 20,763 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Brooklyn Park, MN 55444

Summit Building School of Nursing at Saint Thomas University
Renovation
Pending Verification
Saint Paul, MN 55105

Roof Repair of Biosystems and Agricultural Engineering and Haecker Hall Buildings
Renovation
Post-Bid
Minneapolis, MN 55455

NCC-21-Microbiology Lab Renovation
Renovation
Results
Bloomington, MN

UMD AB Anderson Hall
Renovation
Post-Bid
$3,700,000 est. value
Duluth, MN 55812

Hobson Dishroom Renovation
Renovation
Results
Less than $175,000 est. value
Bemidji, MN 56601

Rasmussen University
Build-Out - 32,000 SF
Post-Bid
Eagan, MN 55121

NHCC - 20 - HR Office and Plant Services Kitchen Renovation
Renovation
Results
Minneapolis, MN 55445

PTCC-20 Technical/Trades Lab Addition and Renovation
New Construction, Renovation, Addition - 75,000 SF
Post-Bid
$14,985,000 est. value
Pine City, MN 55063

Reported 11/10/2021 12:00 AM
Project Title

Science Classroom Remodel

Physical Address View project details and contacts
City, State (County) Holdingford, MN 56340   (Stearns County)
Category(s) Education, Laboratory
Sub-Category(s) College/University, Laboratory
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work will consist of removal and replacement of flooring, new casework consisting of science lab stations, fume hood, eye wash/shower station, etc. An exhaust fan and ERV will be installed on roof to serve classroom. Existing water and gas lines will be modified and upsized to serve new area. Added power outlets throughout room and lab stations

Details

College/University, Renovation, Laboratory, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents