Similar Projects
Annual Contract for Ductile Iron Pipe
Bidding
San Antonio, TX 78275

Annual Contract for Joint Restraints
Bidding
San Antonio, TX 78275

Advanced Metering Infrastructure (AMI) Solution for the Connect H20 Program
Post-Bid
$2,500,000 to $4,000,000 est. value
San Antonio, TX

2019 Water Meter Replacement
Post-Bid
Elmendorf, TX 78112

Pleasanton Road Water Main Replacement at Hume Road
Results
Less than $3,850,000 est. value
San Antonio, TX

Submeter Repair and Upgrade for Legacy at Crown Meadows
Results
San Antonio, TX 78251

Park Forest Water Main Improvements Project
Bidding
Less than $1,750,000 est. value
San Antonio, TX

Replacement 10" Backflow Preventer for UTSA Boulevard
Post-Bid
$80,000 est. value
San Antonio, TX 78249

Informal Annual Contract for Water Treatment Services for the Alamodome
Results
San Antonio, TX 78283

Construction Bids for Approximately 3,200-Feet of 12-Inch Water Main Near Toutant Beauregard Road and Future Scenic Crest Blvd
Bidding
San Antonio, TX 78249

Toepperwein Road Water Improvements
Post-Bid
Converse, TX 78109

Annual Contract for Flex Seal Adjustable Repair Couplings
Results
Less than $170,772 est. value
San Antonio, TX 78200

Redbird Ranch Phase 2 - Water, Sanitary Sewer, Street and Drainage Improvements
New Construction
Post-Bid
San Antonio, TX 78253

Kitty Hawk/Cibolo Creek 12" Waterlines
Results
Universal City, TX 78148

Back Flow Inspection, Maintenance, Repair and Installation
Term Contract
Post-Bid
San Antonio, TX 78204

Reported 01/23/2020 12:00 AM
Project Title

Meter Data Management System (Mdms) Solution for the Connect H20 Program

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78212   (Bexar County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

San Antonio Water System (“SAWS”) is seeking qualified firms to provide the technology and services to implement a Meter Data Management System (MDMS) as part of the SAWS Connect H2O program. Under Connect H2O, SAWS specifically seeks to: -Procure new static water meters and implement Advanced Metering Infrastructure (AMI) Solution -Procure and implement a Meter Data Management System (MDMS) (resulting from this RFCSP); -Procure & execute End Point Installation (EPI) Services.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents