Similar Projects
Intersection Safety Improvements - US 15/SC 61
Infrastructure
Bidding
$2,000,000 CJ est. value
Walterboro, SC 29488

Middle Branch WWTP Headworks Improvements
Renovation, Infrastructure
Bidding
$3,500,000 CJ est. value
Easley, SC 29642

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Ann Drive - 8" Water Main
Infrastructure
Post-Bid
SC 29640

The Grant Meadow Overlook
Results
SC

Ashley Drive Culvert Replacement Project
Results
Clemson, SC

East Beach Drive, Safety and Traffic Improvements, Renovations
Infrastructure
Bidding
$800,000 CJ est. value
Clemson, SC 29631

Adkins WTP Raw Water Intake and Transmission Line Improvements
Infrastructure
Post-Bid
$7,000,000 est. value
Six Mile, SC 29682

Old Dacusville Road Box Culvert
Infrastructure
Results
Easley, SC 29640

South Green Hardscape ADA
Infrastructure
Bidding
$1,200,000 CJ est. value
Clemson, SC 29631

Drilling Services
Infrastructure
Post-Bid
Clemson, SC

Press Road Retaining Wall Relocation
Infrastructure
Results
$750,000 to $800,000 est. value
Clemson, SC 29631

City Wide- Non-Mechanical Radio Read Water Meter Replacement/Installation
Infrastructure
Post-Bid
Liberty, SC 29657

Silver Creek Box Culvert
Infrastructure
Results
Central, SC 29630

Perimeter Road Water Distribution System Piping Replacement
Infrastructure
Post-Bid
$350,000 to $5,000,000 est. value
Clemson, SC 29631

Last Updated 08/30/2022 04:10 PM
Project Title

South Campus Stormwater and Landscape Improvements

Physical Address View project details and contacts
City, State (County) Clemson, SC 29631   (Pickens County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Dam/Tunnel, Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,100,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition, tree protection, erosion control, earthwork, utility relocation/realignment, site work, and stabilization for the construction of a permanent wet stormwater retention pond in the existing "Suber Dam" area of Clemson University as specified by sheets C-100 through S-6 of the drawings. Construction clock will start on the proposed Date of Commencement, March 1, 2023, but materials may be procured any time after Notice to Proceed has been posted. Construction Cost Range: $900,000 to $1,100,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Erosion and Sedimentation Controls, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents