Similar Projects
Electrical, Framing, Mechanical, Flooring,Plumbing, Drywall
Alteration
Design
San Francisco, CA 94128

Timber Ridge Booster Pump Station Rehabilitation
Demolition, New Construction, Infrastructure
Bidding
$12,500,000 CJ est. value
Yorba Linda, CA 92886

RFQ Contractor - Blacklake Sewer System Consolidation Project - Force Main Prequalification Package
Infrastructure
Bidding
$4,500,000 CJ est. value
Nipomo, CA 93444

Encinitas Valve Replacement Project 2022
Renovation
Sub-Bidding
$1,160,000 CJ est. value
Encinitas, CA 92024

Pump Services at Well 23
Infrastructure
Sub-Bidding
$120,000 CJ est. value
Santa Clara, CA 95050

Modular Classroom Restroom Addition At Haynes Elementary School
Renovation
Post-Bid
Ontario, CA 91762

Building D 2nd Floor Labs Mechanical System Upgrades
Alteration
Post-Bid
$600,000 est. value
Long Beach, CA 90808

Plumbing Services
Term Contract
Results
$200,000 est. value
San Jose, CA 95128

Plumbing Contractor
Term Contract
Results
Concord, CA

Pavement Management Plan Project (Northbound Moulton Parkway Between Calle Cortez and via Campo Verde)
Infrastructure
Bidding
$200,000 CJ est. value
Laguna Woods, CA 92637

Plumbing Contractor
Term Contract
Sub-Bidding
Santa Monica, CA 90401

Plumbing Services BPA
Term Contract, Alteration
Post-Bid
Edwards, CA

District Wide HVAC Replacements 11 Campuses (COVID) - Plumbing
Alteration
Results
$1,000,000 est. value
Hesperia, CA 92344

Sugarloaf Water System Improvement Project
Renovation, Infrastructure
Bidding
$2,300,000 CJ est. value
Lakehead, CA 96051

Plumbing Unit Price Job Order - Facilities Management 2022
Term Contract
Sub-Bidding
$5,000,000 CJ est. value
Los Angeles, CA 90012

Last Updated 09/26/2022 04:36 PM
Project Title

Pipeline Project

Physical Address View project details and contacts
City, State (County) La Mesa, CA 91942   (San Diego County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $3,720,494 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 12, 2022, project was awarded to SC Valley Engineering Inc., with an awarded amount of $3,720,494. Construction is expected to start in August Goals for minority participation for each trade 16.9% Goals for female participation in each trade 6.9% The project consists of replacing approximately 5,800 linear feet of 6-inch, 8- inch and 12-inch diameter, 1940s and 1950s vintage cast-iron pipe in Chambers Street, West Cypress Avenue, Manor Drive, Alley (south of Linda Way), Alley (north of Linda Way), and East Madison Avenue with approximately 6,200 linear feet of 8-inch and 12-inch diameter PVC pipe within the City of El Cajon. Liquidated Damages: $1,000.00 Per Calendar Day Bid Bond Percentage: 10% Pre-Qualification for Bidders: Not Required License Type Required: A or C34 Engineer's Estimated Cost: $3,250,000 to $3,250,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents