Similar Projects
Baxter Boulevard Pump Station Upgrades
Renovation
Results
Portland, ME 04103

Pump Station 2 & Passamaquoddy Road Sewer & Water System Improvements
New Construction, Demolition - 17,060 SF
Construction
Perry, ME 04667

Wastewater Treatment Facility and Pump Station Upgrades
Renovation
Results
Lincoln, ME

P-381 Multi-Mission Dry Dock #1, Portsmouth Naval Shipyard (PNSY), Kittery Maine
Post-Bid
$500,000,000 est. value
Kittery, ME

School Street Pump Station Improvements
Results
Unity, ME 04988

Hospital Street Booster Station Upgrades
Results
Augusta, ME 04330

Water Street Pump Station Upgrades Pump Procurement Project
Results
Ellsworth, ME 04605

Kennebec Sanitary District Main Pump Station Force Main Upgrade
Results
$640,000 est. value
Waterville, ME

Pump Station 5 - Wildwood
Renovation
Results
Augusta, ME 04330

Gilpatrick Cove and Garry Moore Pump Station Improvements
New Construction
Results
Mount Desert, ME

North Yarmouth Booster Pump Station
New Construction
Results
North Yarmouth, ME 04097

Pump Station and Sewer Extension
Post-Bid
Less than $3,810,000 est. value
Poland, ME

WWTF and Pump Stations
New Construction, Renovation
Results
Bridgton, ME

Last Updated 08/18/2021 09:10 AM
Project Title

Chadbourne, Foss and Michaud Sewer Pump Stations

Physical Address View project details and contacts
City, State (County) Lewiston, ME   (Androscoggin County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Three (3) submersible sewer pump stations in a six (6) foot diameter wet well, three (3) six (6) foot diameter precast check valve vaults, four sewer manholes, sewer piping connections to existing gravity and force mains, electrical conduits and wiring connections, three (3) VFD/control panels, removal of the three (3) existing sewer pump stations, sitework as necessary.

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents