Similar Projects
Aberdeen Elementary School Sanitary Sewer Outfall
Post-Bid
Aberdeen, NC 28315

East River Phase 1 Project
Post-Bid
Clayton, NC 27527

Blythe Creek Grinder Pump Eliminations
Results
Less than $6,189,018 est. value
Waxhaw, NC

Area 1 Elementary School Off-Site Utilities
Results
Carthage, NC

Southeast Sewer - Baltimore Sewer Ferc Crossings
Post-Bid
NC

Construction Management Services: Union County CDBG Program
Results
Monroe, NC

East Yancey County Sewer Improvements Phase 2
Post-Bid
Less than $700,000 est. value
Burnsville, NC 28714

2018 Wastewater Collection and Treatment Improvements, Contract 1
Results
Less than $2,980,560 est. value
Albemarle, NC

Sewer Project International Logistics Park of NC and Mid-Atlantic Industrial Park
Post-Bid
NC

2017 Sewer Line Improvements
Results
Oxford, NC

Sediment Remediation
Post-Bid
Jacksonville, NC 28540

Wastewater Collection System Rehabilitation Improvements
Results
Stanley, NC

Sewer Rehabilitation Project
Post-Bid
Apex, NC

Wastewater Collection System Rehabilitation Improvements
Results
Stanley, NC

Repair Sanitary Sewer Line Post Office
Post-Bid
$25,000 to $100,000 est. value
Cherry Point, NC 28533

Reported 12/03/2019 12:00 AM
Project Title

Sewer Line Cleaning for FY19/20

Physical Address View project details and contacts
City, State (County) Wrightsville Beach, NC   (New Hanover County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Cleaning and color video inspection and recording of approximately 10,000 feet of sewer line. The area of cleaning/color video recording is noted on the attached photo by blue lines and a summary of the sewer line lengths. The most common pipe material is clay pipe and the diameters vary from 6” to 8”, with the majority of the pipe in the 8” range. The greater part of the cleaning is on side streets. The side street mains are connected to the main gravity line manhole by outside drop connections. During cleaning, materials/debris shall not be allowed to by-pass and flow downstream of the segment being cleaned. The work will also occur along DOT roadways and the contractor will be responsible for any and all necessary traffic control/devices.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Operation and Maintenance of Utilities, Operation and Maintenance of Sewer Utilities, TV Inspection of Sewer Pipelines, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents