Similar Projects
North County Elementary School - Palm Beach County
New Construction, Infrastructure
Conception
$29,885,542 CJ est. value
West Palm Beach, FL 33401

West Acreage Area Elementary School - Palm Beach County School
New Construction, Infrastructure
Conception
$29,885,542 CJ est. value
West Palm Beach, FL 33401

Villages of Windsor
New Construction, Infrastructure
Design
$71,000,000 CJ est. value
Boynton Beach, FL 33426

Walmart Supercenter #2176-225 - OGP-HC
Renovation - 850 SF
Design
Jupiter, FL 33458

Wawa #5365
New Construction - 7,208 SF
Post-Bid
$1,145,000 est. value
Loxahatchee Groves, FL 33470

AutoZone #5999 / Wellington (Loxahatchee Grove)
New Construction, Infrastructure - 7,381 SF
Post-Bid
$1,500,000 CJ est. value
Village of Wellington, FL 33414

Roadway and Parking Lot Paving - Palm Beach Shooting Sports Complex
Infrastructure
Results
$2,900,000 est. value
West Palm Beach, FL 33412

Northlake Boulevard from East of Avenir Drive to West of SR 7
Infrastructure
Results
Palm Beach Gardens, FL

Restaurant Row
New Construction - 22,500 SF
Construction
$8,009,342 est. value
Boca Raton, FL 33432

575 Rosemary
New Construction - 495,000 SF
Construction
$140,000,000 est. value
West Palm Beach, FL 33401

The Collection at Boca Town Center
Demolition, New Construction, Infrastructure - 180,029 SF
Pending Verification
$90,000,000 CJ est. value
Boca Raton, FL 33431

The Collection at Boca Town Center
Demolition, New Construction, Infrastructure - 180,029 SF
Pending Verification
$90,000,000 CJ est. value
Boca Raton, FL 33431

Western Communities High School - Palm Beach County
New Construction, Infrastructure
Conception
$92,983,968 CJ est. value
West Palm Beach, FL 33401

Groves Town Center - Master Plan
New Construction - 39,609 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Loxahatchee, FL 33470

7-Eleven #41621
New Construction - 8,726 SF
Post-Bid
$1,429,817 est. value
Palm Beach Gardens, FL 33403

Last Updated 06/09/2023 10:02 AM
Project Title

Raceway Market - Lantana Road / Lake Worth

Physical Address View project details and contacts
City, State (County) West Palm Beach, FL 33401   (Palm Beach County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Gas Station, Paving/Reconstruction, Retail, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Conceptual Design, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $1,300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

https://discover.pbcgov.org/pzb/zoning/Hearings-Meetings-DRO/2023-03-08-AgendaDRO.pdf Control No: 2003-00099 Application No: ABN/DOA/CA-2022-01898 (Application Name: Lantana Plaza) application of Lantana Parcel LLC by Cotleur & Hearing Inc. Title: a Development Order Abandonment Request: to abandon a Financial Institution on 9.66 acres Title: a Development Order Amendment Request: to modify Conditions of Approval, the Site, Regulating and Master Sign Plans on 9.66 acres Title: a Class A Conditional Use Request: to allow Retail Gas and Fuel Sales on 9.66 acres General Location: Northeast corner of Lantana Road and Haverhill Road Project Manager: Jordan Jafar, Senior Site Planner BCC District: 3 __________________________________________________________________ The project is located on the northwest corner of the intersection. Scope details have not been released. As of September 20, 2021 the project is in planning stage. The Palm Beach County Developer Review Officer approved the project September 14, 2021. Information regarding the architect, general contractor and method of selection has not been disclosed. A construction timeline has not been determined, but is not expected to begin before the spring of 2022.

Details

1 Story Above Grade, New Construction, New Construction. 1 Story Above Grade, New Construction, New Construction.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment, Loading Dock Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Casework, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents