Similar Projects
Asphalt Maintenance Work Order Contract
Alteration
Design
$1,000,000 est. value
WA

Concrete Maintenance Work Order Contract
Alteration
Design
$1,000,000 est. value
WA

Agricultural Resource Center
New Construction, Infrastructure - 5,748 SF
Bidding
$4,125,000 CJ est. value
Tacoma, WA 98446

Runway 16-34 (17-35) Rehabilitation & Associated Improvements
Infrastructure
Bidding
$3,500,000 CJ est. value
Auburn, WA 98002

Trees and Concrete Upgrade
Alteration
Post-Bid
$285,000 est. value
Clarkston, WA

Russell Creek Project
Alteration
Post-Bid
WA

Nisqually State Park Maintenance Building Phase 1
New Construction, Infrastructure, Alteration
Results
$1,289,979 est. value
Eatonville, WA 98328

Kelsey Creek Picnic Shelter Paving
Infrastructure
Results
$15,000 est. value
Bellevue, WA 98005

Rebid Green Lake Community Boathouse
Demolition, Renovation, Infrastructure
Construction
$8,367,000 CJ est. value
Seattle, WA 98103

DR0515 Repair Fairway 15
Term Contract
Design
$5,000,000 est. value
WA

Olympic Middle School Athletic Fields
Infrastructure
Bidding
$18,000,000 CJ est. value
Auburn, WA 98002

Main Canal Polyurea
Alteration
Post-Bid
Ephrata, WA 98823

3rd Street SW And Lea Hill Bridge Deck Preservation
Renovation, Infrastructure, Alteration
Results
$700,000 to $900,000 est. value
Auburn, WA 98092

Gustaves Manor Envelope Upgrade
Renovation
Design
$3,446,000 CJ est. value
Auburn, WA 98002

West Canal Polyurea
Alteration
Post-Bid
Quincy, WA 98848

Last Updated 03/03/2023 05:32 PM
Project Title

Steep Creek Bridge Replacement

Physical Address View project details and contacts
City, State (County) Castle Rock, WA 98611   (Cowlitz County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,445,500 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Steep Creek Bridge: The project consists of, but is not limited to, providing all materials, labor and equipment necessary to remove the existing 132' Glulam bridge, remove the existing mid-span piers, remove the existing wood-side and town-side substructures, remove the existing wood-side and town-side wing walls, acquisition and installation of new substructures, structural excavation and backfill, acquisition and installation of a new 18' x 144' pre-stressed concrete Bulb T bridge, installation of rip rap rock armoring, as well as associated bridge approach work. The project consists of, but not limited to, providing all materials, labor and equipment necessary to install and construct the MSE wall at station 55+80 to 56+44. Site Directions: From Stevenson west on SW Rock Creek Drive for 1 mile, turn right on Ryan-Allen road, travel 3/4 mile to Red Bluff Road, turn left on Red Bluff Road. Travel 0.5 miles to CG 2000 road. Travel 5.4 miles to Steep Creek Bridge. Steep Creek Bridge site; MP 5.4 on the CG-2000 Lat- 45.748 deg, Long--121.9826 deg TIME OF COMPLETION The undersigned agrees to complete the work defined in the Contract Documents on or before the following completion dates: Date of Substantial Completion: October 15, 2023. Date of Final (Physical) Completion: Within 14 calendar days following the Date of Substantial Completion. LAST DAY FOR QUESTIONS IS January 24, 2023.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents