Similar Projects
Last Updated | 08/16/2023 03:20 PM |
Project Title | Asphalt Mill and Overlay |
Physical Address | View project details and contacts |
City, State (County) | Edgerton, WI 53534 (Rock County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected September 2023 |
Bids Due | View project details and contacts |
Estimated Value | $800,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The scope of work consists of the milling of 2-inches of asphalt and overlay of 2.25-inches of hot mix asphalt to the roads listed in Exhibit A. Remove asphaltic pavement by milling at the location(s) and to the thickness(es) shown on Exhibit A and disposing, hauling, salvaging, stockpiling or reusing of the milled materials on the Project Site. The City of Edgerton reserves the right to contract with the Bidder that has been determined to be in the best interest of the City after full consideration of cost, schedule and overall value. The City of Edgerton also reserves the right to reject any or all Bids and the right to adjust the schedule as may be required due to weather conditions. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |