Similar Projects
USH 14 - Re/Reconditioning / Mill and Overlay
Infrastructure
Conception
$1,000,000 est. value
Evansville, WI 53536

North West Interceptor Splitter Box Construction and Slip Lining - City of Beloit
Renovation, Infrastructure
Conception
$250,000 CJ est. value
Beloit, WI 53511

Illinois State Line - Madison Incident Management
Infrastructure
Design
$4,000,000 CJ est. value
Janesville, WI 53546

Illinois State Line - Madison Incident Management
Infrastructure
Design
$4,000,000 CJ est. value
Janesville, WI 53546

Paving East Stateline Road from Dry Creek East to Freechurch Road
Infrastructure
Post-Bid
$300,000 est. value
WI

Paving Work on 26th Avenue (Swamp Road)
Infrastructure
Post-Bid
$80,000 est. value

Street Crack Sealing
Infrastructure
Results
Beloit, WI

West Fulton Street and Utility Improvements
Infrastructure
Results
$125,000 est. value
Edgerton, WI 53534

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Arthur Drive Mini Warehouse
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Milton, WI 53563

Arthur Drive Mini Warehouse
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Milton, WI 53563

Hart Road Storm Water Pond - City of Beloit
Infrastructure
Conception
$400,000 CJ est. value
Beloit, WI 53511

Merrill Street Reconstruction - 77611998-92062 - City of Beloit
Infrastructure
Design
$305,000 CJ est. value
Beloit, WI 53511

Blackhawk Technical College Public Safety Training Center Education Building - Bid Package 2: Re-Bid of Drywall and Landscaping Work Packages
New Construction, Infrastructure
Post-Bid
$3,000,000 CJ est. value
Janesville, WI 53546

Last Updated 08/16/2023 03:20 PM
Project Title

Asphalt Mill and Overlay

Physical Address View project details and contacts
City, State (County) Edgerton, WI 53534   (Rock County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work consists of the milling of 2-inches of asphalt and overlay of 2.25-inches of hot mix asphalt to the roads listed in Exhibit A. Remove asphaltic pavement by milling at the location(s) and to the thickness(es) shown on Exhibit A and disposing, hauling, salvaging, stockpiling or reusing of the milled materials on the Project Site. The City of Edgerton reserves the right to contract with the Bidder that has been determined to be in the best interest of the City after full consideration of cost, schedule and overall value. The City of Edgerton also reserves the right to reject any or all Bids and the right to adjust the schedule as may be required due to weather conditions.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents