Similar Projects
Conestoga Water Treatment Plant Concrete Membrane Tank Lining Rehabilitation Project
Infrastructure
Bidding
$400,000 est. value
Lancaster, PA 17601

Oxford Valley Water Tank Demolition and Removal
Demolition
Bidding
$70,000 est. value
Langhorne, PA 19047

Pocono Auxiliary Water Tank
Post-Bid
$2,390,305 est. value
Swiftwater, PA 18370

Construction of the Clear Shade Tank No. 2
New Construction
Post-Bid
Windber, PA

World-Wide Water Storage Tank Remediation
Term Contract
Results

World-Wide Water Storage Tank Remediation
Term Contract
Results

Walnut Street Water Storage Tank Construction Project
Infrastructure
Bidding
$800,000 est. value
Girard, PA 16417

Elevated Water Storage Tank
Post-Bid
Dallastown, PA 17313

Leachate Storage Tank Liner Project
Results
Williamsport, PA 17701

EQ Tank Cleaning
Infrastructure
Bidding
$350,000 est. value
Auburn, PA

Exterior Tank Painting
Post-Bid
Salisbury, PA

Y1NE--529-14-101 Demolish Water Tower Design Build
Demolition
Results
$500,000 to $1,000,000 est. value
Meridian, PA 16001

Water Tank Improvements
Post-Bid
Stewartstown, PA 17363

2020 Targeted Distribution Improvements - "Whetstone" High Street Tank Interior and Exterior Recoating and Mixer Project
Results
$450,000 est. value
Brockway, PA 15824

Alum Storage Tank at Water Treatment Plant
Post-Bid
Pittsburgh, PA

Last Updated 05/12/2022 12:51 AM
Project Title

South High Tanks Cleaning and Coating / Windfall Tank Cleaning and Coating

Physical Address View project details and contacts
City, State (County) Saint Marys, PA   (Elk County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work under the Contract 2022-01A covers the furnishing of all labor, material, plant, utilities, and services required for the improvements of the South High water storage Tank #1 as well as the cleaning and coating of the interior of Tank #1 and Tank #2. Work under the Contract 2022-01B covers the furnishing of all labor, material, plant, utilities, and services required for the cleaning and coating of the interior and exterior of the Windfall water storage tank. Work under these Contracts 2022-01A & 2022-01B covers the furnishing of all labor, material, plant, utilities, and services required for the improvements of the South High and Windfall water storage tanks including the cleaning and coating of their interior and exterior.

Details

Division 01 - General Requirements, Cleaning and Waste Management.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 09 - Finishes, Painting and Coating.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents