Similar Projects
NCSU Electrical Distribution
Renovation
Bidding
$47,211,000 est. value
Raleigh, NC

Carmichael Gymnasium Addition and Renovation
Post-Bid
$45,000,000 est. value
Raleigh, NC 27607

NOAA Tenant Improvements
Post-Bid
Raleigh, NC 27606

RTP Campus - General Classroom Building 2
Results
Less than $43,994,800 est. value
Raleigh, NC

Dabney Hall Evaluation and Upgrade Phase 2 METRIC Renovation
Renovation
Results
Raleigh, NC

Academic Success Center at DH Hill Library
Renovation - 40,000 SF
Construction
$9,300,000 est. value
Raleigh, NC

Design Build for Restoration of Memorial Belltower
Construction
Less than $6,100,000 est. value
Raleigh, NC

Architecture Project Management Tupper Memorial Hall Rehabilitation
Renovation
Post-Bid
Raleigh, NC 27601

Elevator Additions - Tucker and Owen Residence Halls
Results
$1,400,000 est. value
Raleigh, NC 27695

WTCC - Building NR - Automotive and Collision Repair Facility
New Construction - 100,653 SF
Construction
Raleigh, NC 27616

Lab and Building Systems Renovations to Varsity Research Building
Renovation - 15,200 SF
Post-Bid
Raleigh, NC 27606

NCSU Fountain Dining Hall
Renovation
Results
Raleigh, NC 27695

Wake Tech Community College RT2
New Construction - 66,000 SF
Construction
Morrisville, NC 27560

Dairy Facility at CVM
Term Contract - 10,940 SF
Post-Bid
Less than $5,000,000 est. value
Raleigh, NC 27695

Renovations to the Don Ellis Building
Renovation - 7,000 SF
Results
Less than $1,000,000 est. value
Raleigh, NC

Last Updated 01/25/2021 03:24 PM
Project Title

Tupper Memorial Hall Renovation

Physical Address View project details and contacts
City, State (County) Raleigh, NC 27601   (Wake County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method
Project Status Construction Commenced December 2020
Bids Due View project details and contacts
Estimated Value $211,430
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Includes addition of an elevator.

Details

1 College/University, 3 Stories Above Grade, 15,000 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 14 - Conveying Equipment, Commissioning of Conveying Equipment, Commissioning of Elevators.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents