Similar Projects
Hoots Wings
Build-Out
Conception
Corpus Christi, TX

East Dining Hall Upgrades
Renovation
Conception
Canyon, TX 79016

Tiff's Treats
Build-Out - 1,500 SF
Design
$325,000 est. value
Hutto, TX 78634

Jersey Mike's
Renovation - 1,200 SF
Design
$200,000 est. value
Rosenberg, TX 77469

Starbucks
New Construction - 2,016 SF
Bidding
$500,000 est. value
Prairie View, TX 77445

Lewisville Lake Project
Post-Bid
Lewisville, TX

Starbucks
New Construction - 2,255 SF
Post-Bid
$800,000 est. value
Houston, TX 77002

Ol' South Pancake House
Build-Out - 5,529 SF
Construction
$275,000 est. value
Burleson, TX 76028

Wendy's
Renovation - 2,774 SF
Construction
$200,000 est. value
Kingwood, TX 77339

Wingstop
Renovation - 2,414 SF
Pending Verification
$175,000 est. value
Midland, TX 79707

Walk On's Sports Bistreaux
New Construction
Pending Verification
$3,200,000 est. value
Lubbock, TX

Shipley Do-Nuts
New Construction - 22,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Prosper, TX

Braum's Ice Cream & Dairy Store
New Construction - 5,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Abilene, TX 79601

Domino's #8796
Renovation - 1,300 SF
Post-Bid
$260,000 est. value
Dickinson, TX 77539

151 Coffee
New Construction - 500 SF
Construction
$200,000 est. value
Lewisville, TX 75067

Last Updated 06/28/2022 02:12 PM
Project Title

Angry Cactus Expansion/ San Angelo

Physical Address View project details and contacts
City, State (County) San Angelo, TX 76903   (Tom Green County)
Category(s) Commercial
Sub-Category(s) Food/Beverage Service
Contracting Method Bids by Invitation.
Project Status Construction Documents
Bids Due View project details and contacts
Estimated Value $85,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition, site work, renovation and addition to a restaurant in San Angelo, Texas. Working plans call for the addition of a 2,645-square-foot restaurant. Expansion of existing restaurant into adjacent space As of June 27, 2022, design is complete. An architect has been selected. Information regarding the selection of a general contractor has not been disclosed. Construction is anticipated to begin in September 2022 and be completed in December 2022.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Food/Beverage Service, 2,645 SF Addition.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents