Last Updated | 11/15/2022 11:02 AM |
Project Title | 41st Booster Pump Station Rehabilitation |
Physical Address | View project details and contacts |
City, State (County) | Oakhurst, OK 74107 (Tulsa County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations |
Contracting Method | Competitive Bids |
Project Status | Construction start expected May 2023 , Construction documents |
Bids Due | View project details and contacts |
Estimated Value | $1,070,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | **As of November 15, 2022, bids received were over the budget. Project will rebid but no definite date yet.** For Sand Springs Booster Pump Rehabilitation - Rehabilitate the 41 st Booster Pump Station by removing and replacing headers, floor, walls, roof, pipe, motors and pumps Construction of Water Booster Pump Station Remove & Replace right-angle 16" Bfly Valve, FLGxFLG Remove & Replace right-angle 8" Bfly Valve, FLGxFLG Install 8" welded 3"-wide steel 3/8"-thick butt strap, or equal Remove & Replace Existing Yard 16" Stl Pipe with CL50 16" DIP Poly Wrapped (RJ Install 16 INCH DI 11.25 Deg Bends (RJ) (Contigency Only) 16" DIP Flg Outlets 16" Wall-Penetration Thru Existing Stem Wall Construct Temporary 10x26x8 Pump Building, CL57 Rock Base 8" EBAA 2100 Megaflange, or equal 16"x16"x8" DI Tee, RJ As of September 14, 2022 the engineer for the city Department of Public Works, will be releasing the documents for bidding by the end of the week. Although a firm timeline for construction has not been determined, construction is not expected to commence prior to fourth quarter 2022. Contractor shall have 210 calendar days to complete base bid project independent of alternates. For each Alternate awarded, add 15 calendar days. If the three (3) Alternates are accepted, project complete is extended to 255 calendar days for the entire construction of the project. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |