Similar Projects
Hai Key Creek Lift Station Phase 3 Force Main - Construction - HC1802 - City of Broken Arrow
Renovation
Conception
$561,360 est. value
Broken Arrow, OK

South Park South Lift Station Conversion(Construction) - 2254360 - City of Broken Arrow
New Construction, Infrastructure
Conception
$606,000 est. value
Broken Arrow, OK

Sanitary Sewer System Improvements Harrah Road Lift Station Rehabilitation
Renovation, Infrastructure
Bidding
$825,000 CJ est. value
Harrah, OK 73045

Water System Improvements Water Line Replacement and Booster Pump Station
Renovation, Infrastructure
Bidding
$500,000 CJ est. value
Muskogee, OK 74403

Sheridan Road Booster Pump Station
Infrastructure
Post-Bid
Collinsville, OK 74021

Guymon Lift Station 6 Replacement Project
Renovation
Post-Bid
Guymon, OK

Sewer Force Main Improvements - HDPE Pipe and Plug Valve
Infrastructure
Results
Moore, OK

Raw Water Pump Station Rehabilitation
Renovation
Results
$1,200,000 est. value
Muskogee, OK

Blending of Wells 5, 6, and 52
Infrastructure
Bidding
$550,000 CJ est. value
Norman, OK 73069

Villas on the Green Lift Station Conversion
New Construction
Post-Bid
$180,000 est. value
Broken Arrow, OK 74011

2020 CDBG Reap Water System Improvements
Infrastructure
Results
$176,958 est. value
Ryan, OK

Rmua Haikey Creek Lift Station Phase 4 Improvements Project
Renovation
Post-Bid
$400,000 CJ est. value
Tulsa, OK 74103

Atoka Pump Station Vault and Duct Bank Replacement
Alteration
Results
$968,629 est. value
Oklahoma City, OK

Birdtail Addition
New Construction, Addition
Post-Bid
$2,000,000 est. value
Tahlequah, OK 74464

Battle Creek Tank Inlet-Outlet Modifications and 12 Inch Suction Line Project B
New Construction, Infrastructure
Results
Broken Arrow, OK 74011

Last Updated 11/15/2022 11:02 AM
Project Title

41st Booster Pump Station Rehabilitation

Physical Address View project details and contacts
City, State (County) Oakhurst, OK 74107   (Tulsa County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Construction start expected May 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $1,070,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of November 15, 2022, bids received were over the budget. Project will rebid but no definite date yet.** For Sand Springs Booster Pump Rehabilitation - Rehabilitate the 41 st Booster Pump Station by removing and replacing headers, floor, walls, roof, pipe, motors and pumps Construction of Water Booster Pump Station Remove & Replace right-angle 16" Bfly Valve, FLGxFLG Remove & Replace right-angle 8" Bfly Valve, FLGxFLG Install 8" welded 3"-wide steel 3/8"-thick butt strap, or equal Remove & Replace Existing Yard 16" Stl Pipe with CL50 16" DIP Poly Wrapped (RJ Install 16 INCH DI 11.25 Deg Bends (RJ) (Contigency Only) 16" DIP Flg Outlets 16" Wall-Penetration Thru Existing Stem Wall Construct Temporary 10x26x8 Pump Building, CL57 Rock Base 8" EBAA 2100 Megaflange, or equal 16"x16"x8" DI Tee, RJ As of September 14, 2022 the engineer for the city Department of Public Works, will be releasing the documents for bidding by the end of the week. Although a firm timeline for construction has not been determined, construction is not expected to commence prior to fourth quarter 2022. Contractor shall have 210 calendar days to complete base bid project independent of alternates. For each Alternate awarded, add 15 calendar days. If the three (3) Alternates are accepted, project complete is extended to 255 calendar days for the entire construction of the project.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents