Similar Projects
Walmart #2889-239 Remodel / Clinton
Addition, Infrastructure - 7,278 SF
Bidding
$2,000,000 CJ est. value
Clinton, IA 52732

Asphalt Overlay
Infrastructure
Bidding
$920,940 CJ est. value
Clinton, IA 52732

Structures Demolition Phase I
Infrastructure
Post-Bid
Clinton, IA 52732

Asphalt Alleys & Dead-End Street Resurfacing
Infrastructure
Post-Bid
$400,000 CJ est. value
Clinton, IA 52732

Construction of a Heated Equipment Storage Facility
New Construction, Infrastructure
Results
$350,000 CJ est. value
Elwood, IA 52254

Career Technical Education Building - Bid Package 6
Infrastructure, Alteration
Results
$200,000 est. value
Clinton, IA 52732

HMA Resurfacing / Heater Scarification
Infrastructure
Bidding
$1,500,000 CJ est. value
Calamus, IA 52729

Riverview Skate Park Improvements Project: Specialty Work
Infrastructure
Post-Bid
$522,024 CJ est. value
Clinton, IA 52732

S. 54th Street from US Hwy 30 to 44th Avenue S. and 36th Avenue S. Improvements
Infrastructure
Results
$4,747,210 CJ est. value
Clinton, IA 52732

Pickleball Courts Humeston Road
New Construction
Post-Bid
$475,000 est. value
De Witt, IA 52742

Regional Water Reclamation Facility (RWRF) Improvements Contract 5 - Outfall Expansion
Addition, Demolition, Infrastructure
Results
$1,354,200 CJ est. value
Clinton, IA 52732

Phase 3 - Addition & Renovation Camanche High School
Addition, Build-out, Renovation, Infrastructure
Post-Bid
$11,753,037 CJ est. value
Camanche, IA 52730

Regional Water Reclamation Facility Contract 4 ADM Pump Station
New Construction, Infrastructure
Results
$4,578,000 CJ est. value
Clinton, IA 52732

Riverview Skate Park Improvements Project: Non-Specialty Work
Infrastructure
Post-Bid
$300,000 CJ est. value
Clinton, IA 52732

Regional Water Reclamation Facility (RWRF) Improvements - Contract 3 - Force Main Improvements
Infrastructure
Results
$12,343,338 CJ est. value
Clinton, IA 52732

Last Updated 03/02/2023 10:04 AM
Project Title

Poured-In-Place Rubber Surface for New Playground at Whittier Elementary

Physical Address View project details and contacts
City, State (County) Clinton, IA 52732   (Clinton County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $50,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The general nature of the work is as follows: Provide all labor, material, and equipment required to provide a poured-in-place rubber surface for the new playground equipment. The surfacing shall consist of an SBR base mat and EPDM wear course with both layers being mixed with a non-flammable, non-shrinking, one part moisture cured polyurethane adhesive as recommended by the manufacturer and capable of bonding to concrete. Surface shall be stable and slip resistant to comply with, meet, or exceed all requirements set forth in the Americans With Disabilities Act (ADA) and the American Standard Testing Methods (ASTM) and Consumer Products Safety Commission CPSC) for manufactured Safety Surfaces as detailed below. All components shall be installed by the manufacturer or its certified installers. Surfacing within playground equipment use zones shall meet or exceed the performance requirements of CPSC, ASTM F 1292 and/or CSA Z614-98 that a surface yield a Gmax value of 200 or less and a Head Injury Criteria (HIC) value of no more than 1,000 for a head-first fall from the highest accessible portion of play equipment being installed as shown on drawings. Surfacing shall maintain both of those required impact attenuation characteristics for a period of three (3) years and guaranteed against defects in workmanship and material for a period of no less than five (5) years. The EPDM wear course shall be a blend of 50% Black and 50% Standard Color as chosen by the Owner and as indicated on the Construction Documents. Color transitions shall be full wear course depth. Thickness of wear surface shall be a minimum 3/8". To be completed by: 8/1/2023

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents