Similar Projects
Family Dollar Tree / Bangs TX
New Construction, Infrastructure - 10,500 SF
Design
$500,000 CJ est. value
Bangs, TX 76823

Construction of Raw Water Chemical Feed Improvements
Infrastructure, Renovation - 15,500 SF
Bidding
$780,000 CJ est. value
Brownwood, TX 76801

Construction of Raw Water Chemical Feed Improvements
Infrastructure, Renovation - 15,500 SF
Bidding
$780,000 CJ est. value
Brownwood, TX 76801

Culvert Replacement/Road Remediation on County Road 368
Infrastructure
Post-Bid
Early, TX 76802

Autumn Drive Reconstruction
Infrastructure
Post-Bid
$500,000 est. value
Early, TX 76802

US377- Safety Treat Fixed Objects and Rumble Strips Highway
Results
Less than $991,784 est. value
TX

2021 Group Seal Coat Program
Results

Kirk Chaple / Brownwood Funeral Home
New Construction, Infrastructure - 4,900 SF
Pending Verification
$807,000 CJ est. value
Brownwood, TX 76801

National Chain Retail Store / Brownwood
Addition, Demolition, Infrastructure - 2,900 SF
Pending Verification
$50,000 CJ est. value
Brownwood, TX 76801

2022 Street Repair of Chihuahua Street and River Road. Intersection, and Preservation of Lauren Court, Hillcrest Drive, and Kyle Street
Infrastructure
Post-Bid
$700,000 est. value
La Vernia, TX

San Marcos Aquatic Resources Center - Rehabilitation and Realignment of The Entrance Road
Term Contract
Results
$1,000,000 to $5,000,000 est. value
San Marcos, TX 78666

US0067 - Mill and Inlay
Infrastructure
Results
$426,253 est. value
TX

US0377 - Hot Mix
Infrastructure
Results
$273,500 est. value

Kelcy Way Road Improvement
Infrastructure
Results
$882,517 est. value
Early, TX

VA - Preventive Maintenance
Infrastructure
Results
$2,167,533 est. value
TX

Last Updated 10/13/2022 04:33 PM
Project Title

Take 5 Oil / Brownwood

Physical Address View project details and contacts
City, State (County) Brownwood, TX 76801   (Brown County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Gas Station, Paving/Reconstruction, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: construction of oil lube facility with three bays As of October 13, 2022, a building permit has been submitted, but has not been issued at this time. Information regarding the general contractor selection is unavailable. Construction is estimated to begin Quarter 4 2022. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

1,421 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Metal Doors and Frames, Panel Doors.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 22 - Plumbing, Facility Water Distribution, Facility Storm Drainage.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents