Similar Projects
2021 Road Program Forest Knoll Drainage Improvements
Post-Bid
Libertyville, IL

2021 Road Program Forest Knoll Drainage Improvements
Post-Bid
Libertyville, IL

2020 Alley and Parking Lot Improvements
Infrastructure
Results
Waukegan, IL 60085

2020 Storm Water Improvements
Results
Less than $633,525 est. value
Deer Park, IL

Supplying and Delivering Plastic, and Reinforced Concrete Pipe Concrete Structures Cast Iron Frames, Lids and Grates
Post-Bid
Libertyville, IL

2020 Road Program
Results
Less than $495,730 est. value
Deer Park, IL

2021 Sanitary Transmission Sewer Lining Program
Post-Bid
Lake Zurich, IL

River Trail School Pavement Replacement
Results
Gurnee, IL 60031

2021 Crestfield Subdivision Resurfacing
Post-Bid
Indian Creek, IL

Drainage Improvements
Renovation
Results
Grayslake, IL

Asphalt Roadway
Post-Bid
Deerfield, IL

Mill and Resurface Pavement
Results
Less than $2,965,213 est. value
Libertyville, IL

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

ADA Curb Ramp Improvements
Results
Less than $2,061,786 est. value
Park City, IL 60085

Pulverization of Margate, Parkhill, Crescent Knoll and Portions of Minard Lane
Post-Bid
Green Oaks, IL

Reported 07/13/2022 12:00 AM
Project Title

Storm Sewer Removal and Installation, Culvert Removal and Installation, Patching, Placement of HMA Surface

Physical Address View project details and contacts
City, State (County) Round Lake Beach, IL 60073   (Lake County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Description: The work consists of storm sewer removal and installation, culvert removal and installation, patching, placement of HMA surface course, earthwork, dewatering, and other related items. Project Location: The Cedar Lake Road Culvert Replacements project includes Culvert 85 in Round Lake Beach and Culvert 89 in Lake Villa.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Culverts, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents