Similar Projects
Wet Utilities Job Order Contract-Multiple Locations
Demolition
Design
$2,000 to $1,000,000 est. value
Washington, DC - Indian Head, Patuxent River, MD - Dahlgren, VA

Plumbing Maintenance and Repair Services at Norfolk Naval Shipyard, Portsmouth, Virginia AOR
Term Contract, Alteration
Design
Less than $800,000 est. value
Portsmouth, VA 23709

Onsite Sewage System Installation Project
Infrastructure
Bidding
$75,000 est. value
Rocky Mount, VA 24151

Public Sewer and Public Water Connection for Failing Onsite Sewage System and Well
Infrastructure
Bidding
$30,000 est. value
Williamsburg, VA 23188

FY21 Pipe Lining
Post-Bid
Roanoke, VA

False Cape State Park Residence Alternate Septic System Sod Replacement
Post-Bid
$500,000 to $749,999 est. value
Virginia Beach, VA 23456

Wards Corner Service Area 150 Gravity Sewer and Water Main Replacement - Phase 6
Results
Less than $5,274,581 est. value
Norfolk, VA

Manhole and Wet Well Rehabilitation and Related Services
Term Contract
Results
VA

Turner Fairbank Highway Research Center Project VA ST TFHRC 50(5)
Infrastructure
Bidding
$2,000,000 to $5,000,000 est. value
McLean, VA 22101

Manhole Rehabilitation and Replacement Project
Post-Bid
$1,000,000 to $2,999,999 est. value
Bristol, VA

J--Option - Quarterly Grease Trap Services
Results
Portsmouth, VA

Onsite Sewage System Installation Project
Infrastructure
Bidding
$25,000 est. value
Zuni, VA 23898

Burlington #1158
Renovation
Post-Bid
Vienna, VA 22182

Sanitary Sewer Lining and Rehabilitation
Results
Less than $582,567 est. value
Leesburg, VA 20176

Septic and Well Assistance Program - Service Providers
Infrastructure
Bidding
Richmond, VA

Last Updated 05/31/2022 04:14 AM
Project Title

Small Communities Collection System Rehabilitation - Phase III

Physical Address View project details and contacts
City, State (County) West Point, VA   (King William County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $650,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project or Work consists of furnishing and installing pipelines, utilities, appurtenances, and all associated work including replacing gravity sewers (approximately 150 linear feet), CIPP lining gravity sewers (approximately 2,687 linear feet), installing new manholes (7), rehabilitating manholes (135 vertical linear feet), renovating an existing aerial sewer and supports and associated and appurtenant work including site restoration and paving. The project is located in the Town of West Point.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents