Similar Projects
25E Proposed 36" Water Line Along Centerpoint Energy Corridor and Trickey Road from North Sam Houston Tollway to Spears Road Pump Station
Infrastructure
Bidding
$9,000,000 to $10,000,000 est. value
Houston, TX

Construction Plans for Myrtle Avenue
Infrastructure
Bidding
Webster, TX 77598

Point Aquarius Subdivision Section 1 Waterline Replacement Phase IV
Post-Bid
Houston, TX 77378

Backflow Preventers Certifications, Testing and Repair Services
Term Contract
Post-Bid
Houston, TX 77055

66-inch WL Rehab at US-59 and Beltway 8
Term Contract
Results
$1,624,092 est. value
Houston, TX 77000

HPW - 66-Inch Water Line Interconnection Along W. Hardy Road from Beltway 8 to Greens Road
Results
$20,419,245 est. value
TX

Force Main from Wastewater Treatment Plant No. 2 to Miramesa West Lift Station
Infrastructure
Bidding
$500,000 est. value
TX

8" Check Valve, 8" Plug Valve, All Gaskets and Bolts, Labor to Remove and Install
Post-Bid
Houston, TX 77251

South Campus Domestic Water Line Upgrades and Replacement
Results
$950,000 est. value
Houston, TX 77089

Reclaimed Water Line Phase 4A
Infrastructure
Bidding
Houston, TX

Grey Water Project
Post-Bid
Jersey Village, TX 77040

Water Distribution, Sanitary Sewer, Drainage and Paving Facilities to Serve Jordan Ranch Street Dedication No. 6 and Jordan Ranch Section 22
Results
Houston, TX 77056

Proposed 84-inch Water Line Along Gessner Road From SH249 Regional Pump Station to Greens Bayou
Infrastructure
Bidding
$12,000,000 to $13,000,000 est. value
TX

Install of 4" Valves
Post-Bid
Houston, TX 77251

North Side Water Mains and Fire Protection Design
Results
Jacinto City, TX 77029

Last Updated 08/31/2021 08:43 AM
Project Title

Reclaimed Water Line Phase 3B

Physical Address View project details and contacts
City, State (County) TX   (Harris County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work Covered by Contract Documents: 1. Installation of 3-inch Purple reclaimed water line including bends and fittings. 2. Installation of 6-inch Purple reclaimed water line, by open cut and trenchless construction, including bends and fittings. 3. Installation of 12-inch steel casing, by trenchless construction, including bends and fittings. 4. Installation of 6-inch gate valve and box. 5. 6-inch wet connections to existing reclaimed water system. 6. Installation of air release and vacuum relief valve with manhole. 7. 3-inch wet connection to existing irrigation backflow preventer, including disconnection, plug, and isolation of existing potable water line connection. 8. Installation of 3” backflow preventer and 3” gate valve with connection to new 3” reclaimed water line and connection to existing irrigation line, including all bends and fittings. 9. Trench safety as required per Section 01561. 10. Implementation and maintenance of traffic control plan. 11. Site restoration including removing and replacing concrete sidewalks, driveways, removing and replacing asphalt pavement, damaged fences, turf, plants, trees, and shrubs.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents