Similar Projects
Berths 177-178 Wharf Restoration - Port of Los Angeles - Construction Division
Infrastructure
Conception
$11,400,000 est. value
Los Angeles, CA 90081

Pier 400 On Dock Rail Modernization - Los Angeles County Metropolitan Transportation Authority
Renovation, Alteration
Conception
$999,000,000 est. value
Long Beach, CA 90802

Sacramento Weir Widening Construction Project
Alteration
Design
$100,000,000 to $250,000,000 est. value
West Sacramento, CA 95691

Contractor - Replace Hyde Street Pier
Infrastructure
Design
$10,000,000 est. value
San Francisco, CA

San Bernardino Class 1 Bike Trail Project
Infrastructure
Bidding
$2,000,000 est. value
South Lake Tahoe, CA 96150

As-needed Fender Repair Services
Term Contract
Bidding
$400,000 est. value
San Diego, CA 92101

Z--Golden Gate National Recreation Area - Stabilize Alcatraz Wharf
Term Contract
Post-Bid
$10,000,000 est. value
San Francisco, CA

Suisun Marina Dock Box Replacement Project
Alteration
Post-Bid
$225,000 est. value
Suisun City, CA

Antioch Marina Boat Launch Ramp Dock Repair
Infrastructure
Results
$152,000 est. value
Antioch, CA 94509

Installation of Ada Access Ramps at Various Locations
Alteration
Results
$99,000 est. value
Loma Linda, CA

Crescent Bay Beach Ramp Extension - City Of Laguna Beach
Alteration
Conception
$450,000 est. value
Laguna Beach, CA 92651

Removal of Hard and Soft Marine Growth Services in San Diego
Infrastructure
Bidding
San Diego, CA

Pavement Maintenance and Repairs
Alteration
Post-Bid
$700,000 to $800,000 est. value
Solana Beach, CA

Harrison Emergency Shelter Project - Phase 2
Renovation, Alteration
Results
$375,000 to $475,000 est. value
Corona, CA

Diver's Cove Beach Access Improvements - City of Laguna Beach
Infrastructure
Conception
$1,500,000 est. value
Laguna Beach, CA 92651

Last Updated 07/04/2022 08:14 AM
Project Title

Berths 7 and 8 Fender Replacement and Structural Improvements

Physical Address View project details and contacts
City, State (County) Stockton, CA 95203   (San Joaquin County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of removal of wooden fenders and existing electrical conduits, water line and electrical, with electrical and water relocation. Also included is the installation of a new fender system, steel beam supports, eyewash station, maintenance platforms, utility access lids, and concrete/rebar repair work. Only temporary formwork allowed to be erected in the water. Additional alternate items: Minor concrete/rebar repair and utility removal work is included as an alternate item on the Bid Form. Project site is located at Berths 7 and 8 northwest of the intersection of Port Road B and Port Road 4 of the Port's East Complex.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents