Similar Projects
Colonial Municipal Group
Addition - 3,976 SF
Conception
Westford, MA

BMW Of Shrewsbury
Renovation - 80,016 SF
Conception
Shrewsbury, MA 01545

Ocean Honda
New Construction - 79,099 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Hingham, MA 02043

Metrolube
New Construction - 2,258 SF
Design
$500,000 to $1,000,000 CJ est. value
Chicopee, MA 01020

Berkshire Mazda Addition
Addition - 375 SF
Post-Bid
Pittsfield, MA 01201

Auto Sales & Service
New Construction - 4,800 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Taunton, MA 02780

Maserati - Alfa Romeo
Renovation - 27,000 SF
Construction
$4,500,000 est. value
Brighton, MA

General Truck Center Addition
Addition
Construction
Methuen, MA 01844

National Van Builders
New Construction
Pending Verification
Taunton, MA 02780

Quirk Subaru Dealership
New Construction - 17,404 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Braintree, MA 02184

Belmont Street Auto Dealership
Renovation - 7,328 SF
Conception
Brockton, MA 02401

Amaro Family Auto Sales
New Construction
Design
Taunton, MA 02718

Jiffy Lube #1152
Renovation
Post-Bid
Ayer, MA 01432

Best Chevrolet Expansion
Addition
Construction
Less than $189,086 est. value
Hingham, MA 02043

K & M Auto Sales & Service
New Construction - 4,800 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Taunton, MA 02780

Last Updated 05/20/2021 07:54 AM
Project Title

Shaws Center Repair

Physical Address View project details and contacts
City, State (County) Brockton, MA 02301   (Plymouth County)
Category(s) Commercial
Sub-Category(s) Vehicle Sales/Service
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $40,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work is in two parts. The work under this contract consists of repairing the damage caused by a vehicle hitting the building. Work includes removing and replacing steel studs, exterior sheathing, sheetrock and insulation. In addition, repair water damage in the office to make the office habitable. Scope of work to include repairing suspended ceiling grid, new suspended ceiling tiles, installing gypsum wallboard over existing framing at damaged areas and painting in accordance with plan.

Details

Vehicle Sales/Service, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 05 - Metals, Structural Metal Framing, Metal Joists, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents