Similar Projects
4.5 Alley Utility Improvements Project
Infrastructure
Bidding
Douglas, WY

2022 Asphalt and Concrete Repair Projects
Infrastructure
Bidding
$300,000 est. value
Cheyenne, WY

Wastewater Project Phase I
Infrastructure
Post-Bid
$1,200,000 to $1,450,000 est. value
Basin, WY

WY Nps 2017(1) Moose Wilson Road Phase 1
Term Contract
Post-Bid
Jackson, Teton Village, WY 83001

The Construction of 2021 Fall Street Patching Project
Infrastructure
Results
Jackson, WY 83002

Bar Nunn Asphalt Improvements - Phase II
Alteration
Results
$293,832 est. value
Bar Nunn, WY

Mule Creek Junction - Newcastle (US 85 and US 16)
Infrastructure
Bidding
$200,000 est. value
Lance Creek, WY 82222

Lagoon Modifications and Reliance Collection System Improvements
Infrastructure
Post-Bid
Reliance, WY

Casper - Kaycee (Horse Ranch Creek South)
Infrastructure
Results
Casper, Kaycee, WY

District 4 Logo Signs
Infrastructure
Bidding
$200,000 est. value
Gillette, WY

WY NPD Yell 14(1) Lewis River Bridge
Term Contract
Post-Bid
Yellowstone National Park, WY

District 3 Bridge Rehabilitation
Infrastructure
Results
WY

District 1 Contract Patching
Infrastructure
Bidding
$200,000 est. value
Cheyenne, WY 82009

2021 Water Sewer Rehabilitation Project
Infrastructure
Post-Bid
Albin, WY

Sweetwater Jct. - Riverton (Beaver Rim South & Middle Section)
Infrastructure
Results
Riverton, WY

Last Updated 04/15/2022 12:11 AM
Project Title

Industrial Avenue Drainage and Surfacing Improvement - Elm Street to David Street

Physical Address View project details and contacts
City, State (County) Casper, WY   (Natrona County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status No Responses Submitted
Bids Due View project details and contacts
Estimated Value $550,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of approximately 700 LF of storm pipe, 235 LF of sanitary sewer, 1,400 LF of curb and gutter, 770 SY of sidewalk, 3,400 SY of street reconstruction, and other miscellaneous items.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Public Storm Utility Drainage Piping, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents