Similar Projects
Metcalf Avenue Mixed-use Project
New Construction - 19,559 SF
Design
$135,000,000 est. value
Overland Park, KS 66209

Aspire
New Construction - 493,000 SF
Design
$575,100,000 est. value
Overland Park, KS 66251

RFQ Engineering - 2022 Playground Replacement Projects
Infrastructure
Bidding
$350,000 CJ est. value
Overland Park, KS 66204

RFQ Engineering - 2022 Bietigheim - Bissingen Park Improvements
Infrastructure
Bidding
$300,000 CJ est. value
Overland Park, KS 66221

UPS Equipment and Support Services
Term Contract
Sub-Bidding
Overland Park, KS 66204

Parks and Recreation Design and Installation for Custom Play Equipment
New Construction
Post-Bid
Overland Park, KS

AB-3 Gravel and 6-Inch Ditch Liner Delivery
Infrastructure
Post-Bid
Kansas City, KS

Strang Park Improvements
Renovation
Results
Overland Park, KS 66212

2021 Parks and Recreation Design/Build Services for Replacement Playground Structures
Addition
Results
Overland Park, KS 66207

163rd Street and University Drive Multi-Family Development
New Construction, Infrastructure
Pending Verification
$230,000,000 CJ est. value
Gardner, KS 66030

Foxridge Apartments
New Construction, Infrastructure - 11,837 SF
Design
$116,000,000 CJ est. value
Mission, KS 66202

RFQ D/B - Veterans Park Inclusive Playground
Infrastructure
Bidding
$200,000 CJ est. value
Gardner, KS 66030

Window Cleaning Services
Term Contract
Post-Bid
Leawood, Lenexa, Merriam, Mission, Olathe, Overland Park, Prairie Village, Shawnee, KS 66061

Meadowbrook Park Phase 2 Improvements
New Construction, Infrastructure
Results
Prairie Village, KS 66207

Design-Build Services Community Skate Park
New Construction
Post-Bid
Lenexa, KS 66250

Last Updated 08/11/2022 02:31 AM
Project Title

2022 Tree Trimming Program

Physical Address View project details and contacts
City, State (County) Prairie Village, KS 66208   (Johnson County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Park/Playground, Service/Term Contracts
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes, but not limited to , trimming city street trees in designated areas and park trees, including updating of Area Maps indicating dates trees were trimmed. All equipment, material and workmanship must be in accordance with the Bid Documents, Plans, Project Manual and Contract Documents on file with the City Clerk, Prairie Village, Kansas. Non-resident corporations that are not already registered with the Kansas Secretary of State and all non-resident individuals and partnerships are required by law to register with the Director of Revenue, State Office Building, Topeka, Kansas, and to pay a fee of Ten Dollars ($10.00) for each and every contract as a precedent to commencing work on the contract. For contracts in excess of Ten Thousand Dollars ($10 ,000) , the foreign contractor shall file with the Director of Revenue an acceptable bond for ten percent (10%) of the contract.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents