Similar Projects
980 Crest Valley Drive Stormwater Improvement
Infrastructure
Bidding
Atlanta, GA 30327

980 Crest Valley Drive Stormwater Improvement
Infrastructure
Bidding
Atlanta, GA 30327

Concrete Pipe Annual Contract
Term Contract
Post-Bid
Gainesville, GA 30501

Landslide Stabilization on the Forests
Post-Bid
Chatsworth, GA

Water, Waste Water, and Storm Water Run-Off Usage at The Gillem Enclave
Results
Forest Park, GA 30297

Sweetwater Creek Rehabilitation - Phase 1
Results
Less than $2,022,280 est. value
East Point, GA

Big Creek Greenway Phase 2 Rehab
Infrastructure
Bidding
Cumming, GA

Construction of the Lamb Loop Street and Drainage Improvements to Serve the CCBCI Distribution Center
Post-Bid
Less than $725,000 est. value
Tifton, GA 31793

Claradon Avenue and Benning Drive Culvert Work
Results
Columbus, GA

Enota Stormwater Project
Infrastructure
Bidding
Dahlonega, GA 30533

Storm Drainage and Street Improvements Phase III
Post-Bid
Bronwood, GA

Cedar Mountain Road Stormwater Improvement Project
Results
Douglasville, GA 30134

Deep Forest Lane Drainage Connection Project
Infrastructure
Bidding
Fayetteville, GA

Sewer System Evaluation Surveys
Post-Bid
Lake City, GA 30260

5280 North Powers Ferry Road Phase 1 Streambank Repair and Culvert Replacement Project
Results
Sandy Springs, GA 30328

Reported 09/22/2021 12:00 AM
Project Title

Stormwater Detention Ponds Remediation

Physical Address View project details and contacts
City, State (County) Grovetown, GA   (Columbia County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of removing vegetation & silt from existing stormwater detention ponds, inspecting, repairing and/or replacing outlet control structures and outfall pipes through dams, constructing and/or restoring gravel access roads to ponds, installing and/or repairing chain link fencing & gates, and implementing erosion & sediment control best management practices

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents