Similar Projects
RFQ Engineering - Engineering Services to Assist in the Planning and Replacement of the Existing HVAC Control System
Term Contract
Conception
$300,000 CJ est. value
Augusta, ME 04330

Community Development Block Grant Business Facade Grant Project
Renovation
Design
$30,000 CJ est. value
Belfast, ME 04915

Vendor Lists
Alteration
Design
Newfield, ME

Snow Plowing and Sanding Bids
Term Contract
Sub-Bidding
Monson, ME 04464

Materials List for the Plumbing and Heating Technology Program
Term Contract
Sub-Bidding
Auburn, ME 04210

Green Infrastructure System Inspection and Maintenance Services for the Water Resources Division of the Public Works Department
Post-Bid
Portland, ME

Mowing/Leaf and Debris Removal for 2021
Term Contract
Post-Bid
Hancock, ME

UMA Jewett Hall Auditorium
Renovation
Results
Augusta, ME

Crane Services to Launch Marina Docks
Term Contract
Results
Bangor, ME

317 Main Street Community Music Center
Addition - 9,100 SF
Construction
$3,000,000 est. value
Yarmouth, ME 04096

Johnson Hall Performing Arts Center Renovation Phase 1
Renovation
Construction
$4,900,000 est. value
Gardiner, ME 04345

On Call Specialized Bridge Welding - Regions 1, 2, 3, 4, and 5
Term Contract
Sub-Bidding
Augusta, ME 04330

Auditorium Upgrade
Renovation
Post-Bid
East Millinocket, ME

Septic Tank / Vault Toilet Pumping and Disposal Services
Term Contract
Results
Campton, Gorham, NH 03581

Johnson Hall Historic Theater Phase 2
Renovation - 13,210 SF
Construction
$532,250 est. value
Gardiner, ME 04345

Last Updated 08/08/2022 02:01 PM
Project Title

RFP Design - Schoolhouse Arts Center Building Assessment

Physical Address View project details and contacts
City, State (County) Standish, ME 04084   (Cumberland County)
Category(s) Entertainment/Recreation, Single Trades
Sub-Category(s) Service/Term Contracts, Theaters/Auditoriums
Contracting Method Bids by Invitation
Project Status Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Owner
Owner View project details and contacts
Architect View project details and contacts
Description

Structural Components; evaluate the footings, foundations, slabs, columns, floor framing system, and roof framing system as part of the structural inspection for soundness. Observations will be subject to grade and visibility of components. This is to be a visual inspection only and no structural testing of components or materials will be undertaken. Building Envelope; identify the material elements of the building exterior, to include walls, doors, windows, and fire escapes. This will also include the facade, curtain-wall systems, glazing, exterior sealant, exterior balconies, and stairways. Heating System; identify boilers, furnaces, and major labeled equipment. Ventilation System: The HVAC system should be described and include data on the equipment's specific location, age and life expectancy, and condition. It should be noted if the system is adequate for the heating/cooling air distribution. The assessment must include information regarding the ventilation system(s) and assess overall condition Electrical Systems - Provide detailed summary of the electrical system including the service going into the building (i.e., overhead or underground). This should also include total amperage and other notable features. The type of wiring, location of primary transformer and type of generator (if any) should also be included Plumbing - Identify the plumbing system(s) at the building, including domestic water supply, domestic hot water production over 80 gallons, sanitary sewer, primary backflow preventer or any special or unusual plumbing systems (such as fuel systems, gas systems). Note any deficiencies in the plumbing system(s) for the building including the sewage disposal system. Roofing System: identify the material roof systems, including roof type, reported age, slope, drainage, or any unusual roofing conditions. Observe for evidence of material repairs, significant ponding, or evidence of material roof leaks. Lifecycle - Provide lifecycle data on components listed above including stage in life, estimated life remaining, and cost to repair or replace at conclusion of life. Americans with Disabilities (ADA) - Review building, grounds and parking lot for compliance with the most recent ADA standards. List compliance deficiencies and cost to meet compliance. Site Paving: observe and evaluate the site paving components including paving, curbs, culverts, drains and sidewalks. Grounds: observe and evaluate the grounds for dangerous conditions to patrons, staff or students. Cost estimates- Employ a standardized, nationally recognized, cost estimating system to determine repair and replacement costs for all noted deficiencies. This data shall be presented in a user-friendly reporting format that prioritize current and anticipated maintenance and repair requirements to maximize the utilization of resources and return on investment and minimizes the cost of irreversible loss of service life and total cost. Costs must be broken out by deferred asset maintenance cost by asset component or system, calculate a facility condition index by system, and have the ability to separate rehabilitation and improvement costs from deficiency costs. Costs shall be inclusive of contractor overhead/burden. Interested Team. This will put the sending email address onto the Prospective Team list. All questions from "Teams" regarding this RFP should be submitted by email to the same address. The deadline for the submission of questions is August 26, 2022, at 5PM. Time and date deadlines for submittal will not be waived; however, the Center reserves the right to extend the submittal deadline. The method of contractor selection has not been determined at this time.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating.
Division 10 - Specialties, Signage, Partitions, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Foodservice Equipment, Audio-Visual Equipment, Projection Screens, Projectors, Broadcast, Theater, and Stage Equipment, Recreational Equipment.
Division 12 - Furnishings, Multiple Seating, Fixed Audience Seating.
Division 13 - Special Construction, Sound, Vibration, and Seismic Control.
Division 21 - Fire Suppression, Fire Suppression Systems Insulation.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Theatrical Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems.
Division 28 - Electronic Safety and Security, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents