Similar Projects
2022 Bond - Proposition A - Brock ISD
New Construction, Infrastructure
Conception
$45,600,000 CJ est. value
Brock, TX 76087

2022 Bond - Proposition A - Brock ISD
New Construction, Infrastructure
Conception
$45,600,000 CJ est. value
Brock, TX 76087

Heim BBQ / Hudson Oaks
New Construction, Infrastructure - 7,184 SF
Design
$800,000 CJ est. value
Hudson Oaks, TX 76087

Sherwin-Williams / Hudson Oaks
New Construction, Infrastructure - 4,500 SF
Design
$600,000 CJ est. value
Hudson Oaks, TX 76087

Bailey Ranch Road Reconstruction Section 1
Infrastructure
Bidding
$3,000,000 CJ est. value
Aledo, TX 76008

2022 Drainage Improvements - Phase I
Infrastructure
Bidding
$600,000 CJ est. value
Hudson Oaks, TX 76087

Springtown CDBG - Avenue D Reconstruction
Infrastructure
Post-Bid
$500,000 CJ est. value
Springtown, TX 76082

RFQ/P D/B - Design/Build of Parker County Elementary School District No- 1 - Fire Station No- 46 and No- 47
New Construction, Infrastructure
Post-Bid
$34,916 CJ est. value
Weatherford, TX 76088

New Lake Weatherford Standpipe
Infrastructure
Results
$537,885 CJ est. value
Weatherford, TX 76087

VA Hudson Oaks Multimodal Trail
Infrastructure
Results
$2,672,997 CJ est. value
Hudson Oaks, TX 76087

Elan Hudson Oaks
New Construction, Infrastructure - 53,900 SF
Construction
$41,000,000 CJ est. value
Hudson Oaks, TX 76087

Oykey Retail Center / Hudson Oaks
New Construction, Infrastructure - 12,780 SF
Pending Verification
$2,200,000 CJ est. value
Hudson Oaks, TX 76087

Chicken Express
New Construction, Infrastructure - 3,192 SF
Pending Verification
$850,000 CJ est. value
Hudson Oaks, TX 76087

2022 Bond - Proposition C - Brock ISD
Infrastructure
Conception
$700,000 CJ est. value
Weatherford, TX 76087

Willow Park Medical Plaza 2
New Construction, Infrastructure - 46,000 SF
Design
$7,200,000 CJ est. value
Willow Park, TX 76087

Last Updated 11/09/2022 10:04 AM
Project Title

Willow Park Wastewater Treatment Improvements

Physical Address View project details and contacts
City, State (County) Willow Park, TX 76087   (Parker County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected March 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $14,130,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of November 9, 2022, final design is underway. Information regarding the general contractor or their method of selection has not been disclosed. Construction is scheduled to begin March 2023 and be completed March 2024.

Details

3,436 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents