Similar Projects
Repair of Insulation at the Huntsville Utilities Chase Facility
Alteration
Bidding
$125,000 est. value
Huntsville, AL 35811

Replacement Tile for Dorm Bathrooms, Select Classrooms, and Office
Alteration
Bidding
$200,000 est. value
Birmingham, AL

Conversion to ADA - 736 A Mallory & Conversion to ADA 736 B Mallory
Post-Bid
Alexander City, AL

2007 Kitchen Repair at Fire Station No 29
Post-Bid
Birmingham, AL 35217

Fire Damage Repair Crescent East Apartments
Results
Tuscaloosa, AL

Conversion to ADA - 736 B Mallory
Results
Alexander City, AL

Carver Complex Interior Finishes and HVAC Renovations
Alteration
Bidding
$200,000 est. value
Huntsville, AL 35811

Expanded Metal Partitions for Stock Seat Tahoes
Post-Bid
Mobile, AL

Vacancy Preparation With Repairs
Results
Decatur, AL 35601

Residential HVAC Installation and Miscellaneous Repair
Term Contract
Post-Bid
Birmingham, AL

Tub/Sink/Countertop Resurfacing Services
Results
Phenix City, AL

Expanded Metal Partition for Tahoes
Post-Bid
Mobile, AL

Fire Station 28 - Kitchen Countertop Replacement
Results
$15,820 est. value
Mount Vernon, AL 36560

Restroom Stall Panels
Post-Bid
AL

Roof and Storm Damage Repairs at Piedmont High Fieldhouse School Lectures Hall and Locker Room
Results
Piedmont, AL 36272

Last Updated 05/05/2022 06:15 AM
Project Title

Acoustical Treatment to the McDonald Hughes Storm Shelter

Physical Address View project details and contacts
City, State (County) Tuscaloosa, AL 35401   (Tuscaloosa County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work of Project is defined by the Contract Documents and consists of the following: 1. The project’s primary occupancy is within an existing facility that is considered Group B Business. Work consists of acoustic treatment at the domed storm shelter and any incidental work associated with the construction.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents