Similar Projects
Reported | 06/07/2022 12:00 AM |
Project Title | TMBC Water System Improvements - Highway 43 Corridor Phase III |
Physical Address | View project details and contacts |
City, State (County) | Saint John, ND 58369 (Rolette County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Bidding, Construction Start Expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $4,203,177 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Work includes but is not limited to furnishing and installation of all water main by either trenching or horizontal directional drilling, all valves, curb stops, flush hydrants, and connections to existing water mains. The Work includes but is not limited to furnishing and installation of all water main by either trenching or horizontal directional drilling, all valves, curb stops, flush hydrants, and connections to existing water mains. The project is located along U.S. Highway 281 from 104th Street NE and 108th Street, along 104th Street NE from U.S. Highway 281 to 33rd Avenue NE on the South side, along County Road 43 starting at School Section Lake and heading West to U.S. Highway 281, and along 108th Street NE from U.S. Highway 281 to 35th Avenue NE. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |