Similar Projects
Large and Small Culvert Repairs and Replacements
Infrastructure
Bidding

Large and Small Culvert Repairs and Replacements
Infrastructure
Bidding

White Creek Road (CR 60) - Bank Stabilization
Post-Bid
Newport, NY 13416

West Pointe Marina Seawall (REDI MO 18)
Post-Bid
Rochester, NY 14612

Gooseberry Creek Revitalization Strategy - Creek Walk Park
Results
Less than $300,000 est. value
Tannersville, NY

Mirror Lake Drive Sidewalk, Drainage and Pavement Improvements
Results
Less than $1,100,000 est. value
Lake Placid, NY

Water Infiltration
Infrastructure
Bidding
$750,001 to $100,000 est. value
Queens, NY 11101

Upper Union Median Improvements
Post-Bid
Niskayuna, NY 12309

Where and When Structures Repair
Results
Less than $4,700,000 est. value

Interstate Small Culvert Repairs
Infrastructure
Bidding
NY

Site Improvements at Village of Fairport Bicentennial Canal Gateway Northwest Bank Enhancements
Post-Bid
Less than $1,630,000 est. value
Fairport, NY 14450

Culvert Replacement Project CR23 (Brook Road) Over Slade Creek, Saratoga Springs
Results
Ballston Spa, NY 12020

Highway and Culvert Maintenance
Infrastructure
Bidding

Corrugated Metal Pipe Arches and Aluminized Pipe Arches
Post-Bid
Owego, NY

Lasalle Park Shoreline Protection Project
Results
$5,000,000 to $10,000,000 est. value
Buffalo, NY 14207

Last Updated 10/25/2021 08:10 AM
Project Title

Rehabilitation of Dive Culvert 92

Physical Address View project details and contacts
City, State (County) NY   (Orleans County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The New York State Canal Corporation (hereafter, the "CANAL" and/or "NYSCC") a Subsidiary of the New York Power Authority (hereafter, "NYPA" and/or "The Authority" ) is seeking a proposal for the Rehabilitation of Culvert 92. The work to be performed includes the following construction activities: 1. Install erosion control features 2. Install waterway diversion at the drop structure 3. Install cofferdam and de-water outlet 4. Clean culvert (Additional testing of removed material may be required for disposal) 5. Continue to dewater outlet as necessary during cleaning 6. Excavate 7. Partial demolition of existing concrete culvert 8. Install stone bedding for proposed replacement portion of culvert 9. Install wingwalls 10. Backfill 11. Remove cofferdam 12. Winter shutdown 13. Landscaping in the spring.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents