Similar Projects
Heerf III Hvac Updates for Covid Prevention Engineering Intervention Touchless Doors Nahc Campus Hinds Community College
Renovation
Design
$800,000 CJ est. value
Raymond, MS 39154

Scott Hall - 2022 HVAC Renovations
Alteration
Bidding
Decatur, MS

Itawamba Community College Sheffield Hall Air Handler Replacement
Renovation
Sub-Bidding
$175,000 CJ est. value
Fulton, MS 38843

Sanderson Center Cooling Tower Replacement
Renovation
Sub-Bidding
$500,000 CJ est. value
Mississippi State, MS 39762

Aberdeen High School HVAC Renovations
Alteration
Post-Bid
Aberdeen, MS 39730

HVAC Renovations for Forrest County Schools
Alteration
Post-Bid
MS

HVAC Maintenance at City of Brookhaven Owned Facilities
Results
Brookhaven, MS

ESSER II Funded HVAC Replacement and Other Projects
Alteration
Results
Cleveland, MS

Vancleave HVAC ESSER
Renovation
Sub-Bidding
$300,000 CJ est. value
Vancleave, MS 39565

Air Purification
Alteration
Post-Bid
$1,130,000 est. value
Carthage, MS 39051

Full Vent Hood and Exhaust Cleaning for Miscellaneous Food Service Areas, G.V. (Sonny) Montgomery VA Medical Center, Jackson, MS 39216
Term Contract
Results
Jackson, MS 39216

Scott Hall-HVAC Replacement
Renovation
Sub-Bidding
$300,000 CJ est. value
Decatur, MS 39327

Carpenter Hall Air Handlers Replacement
Alteration
Post-Bid
Mississippi State, MS 39762

Harrison County Department of Human Services Cooling Tower Replacement
Alteration
Results
$176,900 est. value
Gulfport, MS 39503

HVAC Service Provider
Term Contract
Sub-Bidding
$2,000,000 CJ est. value
Meridian, MS 39307

Last Updated 02/18/2023 11:31 PM
Project Title

Gym HVAC Replacement and Improvements

Physical Address View project details and contacts
City, State (County) Baldwyn, MS 38824   (Lee County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

For Gym HVAC Replacement and Improvements Bid preparation will be in accordance with Section 00 21 13 - Instructions to Bidders, bound in the Project Manual. Proposals shall be submitted with Proposal Security in the form of Certified Check or acceptable Bid Bond in an amount equal to at least five percent (5%) of the base bid; such security is to be forfeited as liquidated damages, not penalty, by any bidder who fails to carry out the terms of the proposal. The Bid Bond, if used, shall be payable to the Owner. Bonds on the project must be received on or before the period scheduled for the project and no bid may be withdrawn after the scheduled closing time for the project. Bids must be firm for a period of forty-five (45) days after the scheduled time of opening. A one hundred percent (100%) Performance-Payment Bond issued by a surety company authorized to do business in the State of Mississippi will be required within ten (10) days after the successful bidder has been notified of the award of the contract to him. All bids submitted by a prime or subcontractor for public works or public projects where said bid is in excess of fifty thousand dollars ($50,000.00) to perform contracts enumerated in Section 31-3-21, Mississippi Code of 1972, shall contain on the outside or exterior of the envelope or container of such bid the contractor's current certificate number. No bid shall be opened or considered unless such contractor's current certificate number appears on the outside or exterior of said envelope or container or unless there appears a statement on the outside or exterior of such envelope or container to the effect that the bid enclosed therewith does not exceed fifty thousand dollars ($50,000.00). NOTE: When bids are submitted electronically, the requirement for including on the exterior of the bid envelope the contractor's current certificate of responsibility number or a statement that the bid enclosed does not exceed fifty thousand dollars ($50,000.00) shall be deemed fulfilled and the bid in compliance by including the same information as an attachment with the electronic bid submittal. The Owner reserves the right to reject any or all bids and to waive irregularities. SUBSTANTIAL COMPLETION: Time is an important consideration on the project. The project shall be substantially complete no later than Friday, July 28, 2023, at 12:00 p.m. LIQUIDATED DAMAGES: The Owner will deduct $150.00 per day liquidated damages for each day of delay exceeding the contract time until such time substantial completion is reached.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents