Similar Projects
Purchase and Delivery of Grinder Pump with Accessories, Assembled, (Duplex Pump System)
Post-Bid
West Palm Beach, FL 33415

Centrifugal Dewatering 12" x 8" Self-Priming Pumps - Trailer Mounted
Post-Bid
FL

Replacement of Surficial Aquifer Well HR-8A
Results
Less than $477,330 est. value
Palm Beach Gardens, FL 33410

Deep Injection Well Monitoring Well MW-1 Replace
Results
West Palm Beach, FL

Well Drilling and Repair Services
Term Contract
Post-Bid
FL

General Injection Well Maintenance and Testing Services
Term Contract
Results
West Palm Beach, FL 33412

Upper Floridan Aquifer (UFA) Well Rehabilitation
Post-Bid
$1,800,000 est. value
Belle Glade, FL 33430

Construction Moss Pilot Project
Results
West Palm Beach, FL

Pump for Reclaimed Water Distribution, Vertical Turbine, OEM
Post-Bid
FL

System-Wide Wellfield Improvements - Phase 1
Results
Less than $12,104,730 est. value
Boca Raton, Delray Beach, FL

Replacement of Surficial Aquifer Well No. 10
Infrastructure
Post-Bid
Palm Springs, FL

Water Treatment Plant Class I Injection Well System Mechanical Integrity Testing
Results
Less than $70,000 est. value
Wellington, FL 33414

Floridan Well Rehabilitation Program
Results
Jupiter, FL 33458

Secondary Effluent Yard Piping for Biosolids Hex Loop Upgrades
Results
West Palm Beach, FL 33417

Injection Well No. 2 Construction
Results
Delray Beach, FL 33445

Last Updated 09/09/2021 08:44 AM
Project Title

Replacement of Surficial Aquifer Wells Br-21C and Br-25C

Physical Address View project details and contacts
City, State (County) Palm Beach Gardens, FL   (Palm Beach County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish all labor, equipment and materials necessary to replace two (2) surficial aquifer production wells (BR-21C and BR-25C) for the Seacoast Utility Authority (OWNER). The scope of work will include: test well/pilot hole drilling, removal of existing screen and well casing, drilling, setting of casings and/or well screen, grouting, testing, well logging, video logging, pump testing, formation water disposal system (including temporary piping and pumps), well facility disinfection, fencing, clearing and restoration of the well site, new pump and motor including column pipe and appurtenances, well head, piping, electrical and controls, site work and restoration

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents