Similar Projects
Last Updated | 03/08/2021 02:10 AM |
Project Title | Cleaning and Painting the Steel Surfaces of Bridge Structures Carrying Sauk Trail Over 1-57 in the Village of Richton Park, Rich Township |
Physical Address | View project details and contacts |
City, State (County) | Richton Park, IL (Cook County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 67000400 Cal Mo Engineer's Field Office, Type a Base Items 12.000 67100100 l Sum Mobilization Base Items 1.000 70102620 l Sum Traffic Control And Protection, Standard 701501 Base Items 1.000 70102625 l Sum Traffic Control And Protection, Standard 701606 Base Items 1.000 70102630 l Sum Traffic Control And Protection, Standard 701601 Base Items 1.000 70102635 l Sum Traffic Control And Protection, Standard 701701 Base Items 1.000 70102640 l Sum Traffic Control And Protection, Standard 701801 Base Items 1.000 70200100 l Sum Nighttime Work Zone Lighting Base Items 1.000 x7011015 l Sum Traffic Control And Protection (Expressways) Base Items 1.000 z0007112 l Sum Containment And Disposal Of Lead Paint Cleaning Residues Base Items 1.000 z0010501 l Sum Cleaning And Painting Steel Bridge No. 1 Base Items 1.000 z0030850 Sq Ft Temporary Information Signing Base Items 51.400 z0076600 Hour Trainees Base Items 500.000 $0.80 z0076604 Hour Trainees Training Program Graduate Base Items 500.000 $15.00 |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |