Similar Projects
Bingham Creek Regional Park Phase 2
Post-Bid
Salt Lake City, UT

Aqua Tots Swim Schools
Renovation - 5,600 SF
Post-Bid
Midvale, UT 84047

Oquirrh Hills Golf Course Pavilion
New Construction - 3,140 SF
Results
Tooele, UT 84074

Park Pavilion
Term Contract
Results
Less than $800,000 est. value
Murray, UT 84107

Park Concessions Building Project
New Construction, Demolition - 900 SF
Construction
West Bountiful, UT 84087

Viewmont High School Baseball Field Renovation
Construction
Bountiful, UT 84010

Nordic Valley Expansion
New Construction
Pending Verification
$6,500,000 est. value
Eden, UT

Construction Of New Baseball Dugouts
New Construction
Post-Bid
Tabiona, UT 84072

Steed Park Pickleball Design/Build
Results
Less than $350,000 est. value
Clearfield, UT 84015

Press Box Buildings and Coaches Offices at Hunter High School
Construction
West Valley City, UT 84120

Clyde Rec Center Pickleball Courts Project
Post-Bid
Springville, UT

2020 Park Improvements
Results
Draper, UT

RAC Shade Structure
Post-Bid
Salt Lake City, UT 84114

Dfcm Construction-Willard Bay State Park Day Use Pond Improvements-19074510
Results
Less than $375,000 est. value
Willard, UT

Homestead Park Pavilion
Renovation
Post-Bid
Riverton, UT 84065

Last Updated 09/21/2020 06:49 PM
Project Title

Maintenance and Development of Ponds

Physical Address View project details and contacts
City, State (County) Uintah, UT   (Weber County)
Category(s) Entertainment/Recreation
Sub-Category(s) Misc. Recreational
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide: services in this contract to maintain stock watering ponds in the Bookcliffs area of Uintah and Duchesne Counties, Utah. Work includes the maintenance of 17 existing stock watering ponds and the construction of 3 new stock watering ponds. Each of the 17 maintenance ponds must be reexcavated and lined with a layer of salt or bentonite to seal the bottom of the pond. Each of the three new pond sites must be excavated and lined with a layer of bentonite clay to seal the bottom of the pond. Attach references of the last 3 previous pond maintenance and development jobs. At a minimum it should include: employer, contact number, specific details of work, days to complete job, and size of crew.

Details

Division 33 - Utilities, Operation and Maintenance of Utilities, Operation and Maintenance of Sewer Utilities, Pond and Reservoir Maintenance, Ponds and Reservoirs, Water Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents