Similar Projects
FM270 Public Boat Ramp Renovation - PK1804 - City of League City
Infrastructure
Conception
$920,000 CJ est. value
League City, TX 77573

Bay Area Boulevard 12" Sewer Improvements FM/LS - WW1702 - City of League City
Infrastructure
Conception
$2,159,643 CJ est. value
Friendswood, TX 77546

GIWW West Galveston Bay Barrier Island Reconstruction with Mining of Placement Area No. 64
Infrastructure
Design
$10,000,000 CJ est. value
Galveston, TX 77550

Water, Sanitary Sewer, and Drainage Facilities to Serve Westland Ranch, Section 2 and Magnolia Bayou Drive
Infrastructure
Design
$600,000 CJ est. value
Texas City, TX 77590

DR1910 Clear Creek Tributary Desnagging
Infrastructure
Bidding
$800,000 CJ est. value
League City, TX 77573

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Pier 10 Redevelopment Roadways, Drainage, Illumination and Traffic Signals
Infrastructure
Post-Bid
Galveston, TX

Annual Asphalt Maintenance
Results
Less than $94,297 est. value
Galveston, TX

2021 Group Seal Coat Program
Results

League City Convenience Store
New Construction, Infrastructure - 12,000 SF
Pending Verification
$250,000 CJ est. value
League City, TX 77573

Delaney Cove Section 14 - Landscape, Irrigation, Hardscape, and Electrical
Infrastructure
Pending Verification
Galveston, TX 77550

LCP and Walker Street Intersection Improvements - ST1913 - City of League City
Infrastructure
Conception
$2,103,434 CJ est. value
League City, TX 77573

Whataburger at Santa Fe
New Construction, Infrastructure - 3,746 SF
Design
$2,500,000 CJ est. value
Santa Fe, TX 77510

East End Cruise Corridor Development 20th Street to Royal Caribbean Way
Infrastructure
Post-Bid
Galveston, TX 77550

FM 2004 - Widen Sldrs, Add Passing Ln, Level Up and Super Pave
Results
$6,951,289 est. value
TX

Last Updated 09/30/2022 01:02 AM
Project Title

SH3 and FM518 Intersection Improvements - ST2003 - City of League City

Physical Address View project details and contacts
City, State (County) League City, TX 77573   (Galveston County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $2,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will add 230 linear feet to the existing Left Turn Lane southbound on SH3 at the FM518 intersection and convert an existing Thru Lane southbound SH3 at the FM518 intersection into a second Left Turn Lane, and a new Right Turn Lane to southbound SH3 at the FM518 intersection. An additional 170 linear feet will be added to an existing Right Thru Lane on southbound SH3 south of the FM518 intersection and 400 linear feet to an existing Left Turn Lane on northbound SH3 at the FM518 intersection. A Conversion of an existing Thru Lane on Northbound SH3 at the FM518 intersection into a second Left Turn Lane and a new Right Turn Lane to northbound SH3 at the FM518 intersection will be included. Additional 180 linear feet will be added to the existing Left Turn Lane on eastbound FM518 at the SH3 intersection with a raised curb median and a new Right Turn Lane eastbound on FM518 at the SH3 intersection. A Right Turn/Thru Lane will be converted to a 460 linear foot Right Turn Lane on westbound FM518 at the SH3 intersection and an additional 110 linear feet will be added to the Left Turn Lane on westbound FM518 at SH3 intersection. Traffic access management measures will be Implemented with raised curbs. The programmed amount reflects the original scope and will be adjusted once the design firm is able to give construction cost estimates for the increase in scope. As of September 30, 2022, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents