Last Updated | 04/25/2023 03:54 PM |
Project Title | Wachusett Dam Lower Gatehouse Pipe and Boiler Replacement - Sub Bid |
Physical Address | View project details and contacts |
City, State (County) | Clinton, MA 01510 (Worcester County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Dam/Tunnel, Lift and Pump Stations, Site Development |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $315,090 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Wachusett Dam Lower Gatehouse Pipe and Boiler Replacement The work includes, but is not limited to, the following: furnishing all labor, materials and equipment to demolish existing pip- ing in Well No. 2, 3 and 4, modifications to existing pipe layout, installation of new isolation and flow control valves, includ- ing electrical/instrumentation; improve- ments to the fountain line, installation of a new access platform, boiler replace- ment, and hazardous material abatement at the Wachusett Dam Lower Gatehouse. The estimated project cost is: $11,064,000. Each General Bid must be accompanied by a current Certificate of Eligibility issued by the Division of Capital Asset Management and Maintenance (DCAMM) showing that the bidder has the classification and capac- ity rating to perform the Work and an Up- date Statement. In order to be eligible to bid, a General Bidder must be certified in the following category of work: Sewage and Water Treatment Plants or Mechanical Systems Each Filed Sub-Bid must be accompanied by a current Certificate of Eligibility issued by DCAMM showing that the Sub-Bidder has been certified to participate on public construction projects and perform the class of work for which the Sub-Bid is submit- ted. Each Filed Sub-Bid must also be ac- companied with an Update Statement. Filed Sub-Bids will be required on the following classes of work: Division Sub-trades 5 Miscellaneous and Ornamental Iron 9 Painting 15 Plumbing 15 Heating, Ventilating & Air-Condition- ing 16 Electrical Work This contract is subject to a 7.24% MBE and a 3.6% WBE participation requirement. **Filed Sub-Bids 11:30 a.m., Au- gust 31, 2022. |
||||||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |