Similar Projects
RFP - Affordable Residential Developer for Oak Park
New Construction, Infrastructure
Conception
$10,000,000 CJ est. value
Oak Park, CA 91377

Arroyo Drive Railroad Crossing Improvement
Alteration
Conception
$1,000,000 est. value
Moorpark, CA 93021

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Camarillo Hills Drain Replacement at Ventura Boulevard - SD-5052 - City of Camarillo
Infrastructure
Design
Less than $12,760,000 est. value
Camarillo, CA 93011

Construct C-130J Flight Simulator Facility at Channel Islands ANGS
New Construction, Infrastructure - 11,225 SF
Bidding
$25,000,000 CJ est. value
Point Mugu NAWC, CA 93041

Community Center Park East Playground Improvement Project
Infrastructure
Bidding
$297,297 CJ est. value
Oxnard, CA 93030

Teague Park Prefabricated Restroom Project - Demolition of Existing Public Restrooms
Demolition, Infrastructure - 1,420 SF
Sub-Bidding
$700,000 CJ est. value
Santa Paula, CA 93060

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Ventura River Trail Sheridan Way Bike Path Link
Renovation, Alteration
Post-Bid
$298,985 est. value
San Buenaventura, CA 93001

Street Lights, Traffic Signals and Damaged Concrete Replacement
Infrastructure
Results

Lawrence Drive/Teller Road Intersection Improvements
Infrastructure
Results
Thousand Oaks, CA 91362

Los Feliz Drive Apartments
New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Thousand Oaks, CA 91362

Hilton Hotel / Ventura
New Construction, Infrastructure - 175,906 SF
Pending Verification
$28,000,000 CJ est. value
Ventura, CA 93001

Los Angeles Avenue Landscape Renovation and Wall Enhancements - M0046 - City of Moorpark
Infrastructure
Conception
Less than $500,000 est. value
Moorpark, CA 93021

Wendy Drive Mixed Use Development
New Construction - 11,790 SF
Design
$2,500,000 est. value
Newbury Park, CA 91320

Last Updated 08/10/2022 11:32 AM
Project Title

Lindero E/S Whim to Hedgewall (1,400 LF) - City of Westlake Village

Physical Address View project details and contacts
City, State (County) Westlake Village, CA 91361   (Ventura County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Implementation of design completed during FY 2021-22 for installation of new sidewalk in City right-of-way along the east side of Lindero Canyon Road from the end of the existing sidewalk at Whim Drive to the signalized intersection at Hedgewall Drive. This project is included in the City of Westlake Village's FY 2022-2027 Capital Improvement Plan (CIP). As of August 10, 2022, information regarding a design team or a general contractor is not available. Funding is anticipated in 2022/2023.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents