Similar Projects
2021 Airfield and Drainage Improvements
Infrastructure
Bidding
Pittsburgh, PA 15231

Furnishing and Delivery of 1200-Feet of 48" Diameter Dual Wall Corrugated HDPE Pipe
Infrastructure
Bidding
McElhattan, PA

Storm Drainage Improvements along Kelly Avenue-Morris Avenue-Duryea Drive
Post-Bid
Folsom, PA 19033

23 NC SGL 37 Stephenhouse Road Maintenance
Post-Bid
PA

Mchenry Road Culvert Project
Results
Benton, PA 17814

Weidner Road Culvert
Results
Boyertown, PA 19512

Culvert Replacement
Infrastructure
Bidding
Erie, PA 16511

Milling, Base Repairs, Resurfacing, Guide Rail, Drainage, and ADA Ramps of South Franklin Street
Post-Bid
Cochranton, PA 16314

Bldg 633 Flood Prevention Repairs, Naval Surface Warfare Center Philadelphia Division, Philadelphia, PA
Results
$25,000 to $100,000 est. value
Philadelphia, PA

Maple Road Drainage Work
Infrastructure
Bidding
Factoryville, PA 18419

Latrobe Transfer Station Streambank Restoration Project
Post-Bid
Latrobe, PA 15650

Powell Rd to SR 706
Results
$100,000 to $199,999 est. value
PA

Whitford Park Sixmile Creek Stream Bank Stabilization Project
Infrastructure
Bidding
Erie, PA 16511

Keyhole Road Culvert Replacement Project
Post-Bid
Holbrook, PA 15341

Bald Top Road Soil Nailing Project
Results
Danville, PA 17821

Last Updated 09/20/2021 11:11 AM
Project Title

Topaz Drive Culvert Replacement

Physical Address View project details and contacts
City, State (County) Chambersburg, PA 17202   (Franklin County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 to $350,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope consists of the removal of the existing structure and the construction of a precast/post-tensioned concrete box culvert. The culvert located on Topaz Drive has a clear span of 12 feet and an approximate length of 50 feet. Utility lines for water, electric, sewer, cable, and phone must be relocated. The roadway work will involve placement of subbase and paving as well as guiderail and other minor improvements.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Concrete Culverts, Cast-in-Place Concrete Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents