Similar Projects
Last Updated | 04/12/2021 04:54 PM |
Project Title | Rectifier Transformer Replacement |
Physical Address | View project details and contacts |
City, State (County) | Chesterton, IN 46350 (Porter County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Remove two existing oil-filled transformers and provide two new oil-filled extra heavy-duty traction power transformers at Tee Lake Substation, located at milepost 23.25, and New Carlisle Substation, located at milepost 13.28. Each have a 2-MW outdoor oil-filled high-voltage transformer that is scheduled to be replaced with a 69 kV primary voltage oil-filled transformer. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |