Similar Projects
Calas Park And Foisia Park Roof Repair - PW1416
Renovation, Alteration
Conception
$492,495 est. value
Carson, CA

Contractor - FY22 Angeles National Forest Roofing Project
Alteration
Design
$700,000 est. value
San Fernando, CA 91342

Operations and Storage Facilities Phase III Construction of New Roof Structure over Existing Fish Tanks Platform
Renovation
Sub-Bidding
$268,380 CJ est. value
Culver City, CA 90230

Roof Encapsulation of Buildings at the Joint Water Pollution Control Plant
Alteration
Post-Bid
Carson, CA

Portable Buildings Roofing Project
Alteration
Post-Bid
Torrance, CA 90504

Repair Building Roof
Alteration
Results
$2,300,000 est. value
CA

Regional Specialty Roofing Job Order Contract
Alteration
Results
$500,000 est. value
Long Beach, CA

Roof Replacement, Art Center, Building 1A
Term Contract
Post-Bid
$490,000 est. value
CA

Orchard Dale Elementary School Modernization Project- Roofing/Sheet Metal
Alteration
Results
Whittier, CA 90603

Reservoir No. 7 Roof Replacement
Alteration
Post-Bid
$600,000 est. value
La Canada Flintridge, CA 91011

Roof Repair and Replacement Services
Alteration
Results
CA

Tower Roof Repair/Maintenance
Alteration
Post-Bid
Long Beach, CA 90815

Roof Repair and Replacement Services
Infrastructure
Results
$500,000 est. value
Los Angeles, CA 90040

Roof Replacement, Restore, Repair at Greenwood Elementary School
Alteration
Post-Bid
$600,000 est. value
Montebello, CA 90640

Corporate Yard Roof Replacement
Alteration
Results
$200,000 est. value
Cerritos, CA 90703

Last Updated 11/29/2022 12:18 PM
Project Title

Library and Child Development Center Roof Repair

Physical Address View project details and contacts
City, State (County) Lancaster, CA 93536   (Los Angeles County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $526,824 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

This project shall consist of the installation of a seamless fluid applied composite roofing system (Basis of Design is WeatherWeld -Liquiform Technologies) at the Library Building approximately 17,200 square feet and the Child Development Center approximately 12,000 square feet. The scope of work shall consist of the removal and vacuuming of the existing gravel roofs. Power wash and clean existing roofs. Install roofing system including reflective coating. All ancillary flashings and walk pads shall be included as part of the installation. New edge metal/gravel stop shall be installed and the existing coping and counter flashings shall be removed, stored and reinstalled once the roofing membrane has been completely installed. Project Type Bid Response Types Line Items General Attachment Type of Award Lump Sum Categories 238160 - Roofing Contractors 423330 - Roofing, Siding, and Insulation Material Merchant Wholesalers License Requirements C-39 Online Q&A Yes Q&A Deadline 11/10/2022 4:00 PM (PDT) Bid Valid 90 Days Start/Delivery Date 12/19/2022 Project Duration 72 Calendar Days

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents