Last Updated 11/06/2020 03:54 PM
Project Title

Airbus Engineering Replace HVAC Units

Physical Address View project details and contacts
City, State (County) Mobile, AL 36615   (Mobile County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Base Bid - Replace roof top HVAC Units; see equipment listing and as-builts to assist with clarifying the scope of work, see Attachment 'D'. Replace equipment with coil guards and coil coatings suitable for coastal environment. Roof top units: Alternate 1 - additional cost for the installation after normal hours; weekday 4:30PM to 6:00AM / weekends Friday 12 noon to 6:00AM Monday (east side of building units) Alternate 2 - controls Alternate 3 - replace electrical disconnects servicing the roof top units Alternate 4 - test and balance Alternate 5 - mini splits - (2) 1.5 ton and (1) 2 ton Alternate 6 - 5-year preventative maintenance: A. Calibration: Safety, temperature, operating, humidity, pressure, economizer controls and equipment/component gauges. B. Adjustment: Refrigerant charges, purge systems, dampers, valves, un-loaders, bets, ran rpm's, chemical feeds, gas pressure regulators, combustion air ratios, set points igniter and flame assemblies C. Alignments: Open drive couplings, belt sheaves, pulleys, coil fins and belt drives. D. Vibration: Damper linkage, fan bearings, axial vane drive, pumps and motors E. Secure and Tighten: Motor terminals, control terminals piping damps, line fittings, mounting hardware, electrical connections, equipment panels, motor mounts, damper sections, vibrations pad and bolts. f. Cleaning: Control devices, electrical contractors, condensers coils, fan blades and impellers, pilot and burner orifices heat exchangers, igniters, chiller and boiler tubes, tower basins, sump and floats, baffles and fill, nozzles and passages and equipment areas.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents