Similar Projects
2023 High School Renovation and District-Wide Facility Improvement Project
Build-out, Renovation
Bidding
$6,105,000 CJ est. value
Munster, IN 46321

Munster High School - North Classrooms Interior Renovations
Renovation
Bidding
$350,000 CJ est. value
Munster, IN 46321

Stadium Rehabilitation
Renovation
Post-Bid
Merrillville, IN 46410

New Construction
New Construction
Post-Bid
Schererville, IN 46375

Flight Type Dish Machine
Renovation, Addition, Term Contract
Results
Merrillville, IN 46410

Crown Point High School
Renovation, Addition
Results
$42,500,000 est. value
Crown Point, IN 46307

Crown Point Christian School Classrooms
Addition
Construction
$2,000,000 est. value
Saint John, IN 46373

New Administration Center, Alternative Education and Resource Center and Related Work
New Construction, Infrastructure
Construction
$19,869,043 CJ est. value
Crown Point, IN 46307

Crown Point Christian School Classrooms Phase II
Addition
Pending Verification
$2,000,000 est. value
Saint John, IN 46373

D/B - 2022 School Facilities Improvements Project
New Construction
Post-Bid
$11,800,000 est. value
Griffith, IN 46319

Progressive Design-Build Contract 2021 Early Learning Center
New Construction
Results
Gary, IN 46410

2022 School Corporation Facilities Improvements Project
Renovation
Post-Bid
$500,000 est. value
Merrillville, IN

MHS IDF Rooms
New Construction
Results
Munster, IN 46321

Block Middle School Renovations
Renovation
Post-Bid
$2,500,000 CJ est. value
East Chicago, IN 46312

Colonel John Wheeler Middle School Addition, Renovation and Related
Renovation, Addition
Results
$3,000,000 est. value
Crown Point, IN 463073808

Last Updated 04/05/2023 02:09 PM
Project Title

Colonel John Wheeler Middle School - New Hockey Locker / Concession Facility and Related Work

Physical Address View project details and contacts
City, State (County) Crown Point, IN 46307   (Lake County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $1,248,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The New Hockey Locker & Concession Facility project consists of furnishing all labor, materials, supervision, tools and equipment necessary to prepare the site, and supply/construct a new 2-level wood frame and masonry building of approximately 3,150 square feet per level. Facility will include 3,640 sq. ft. of finished area for hockey locker rooms, 1,248 sq. ft. of finished concession area with public restrooms, and a 1,412 sq. ft. semi-finished storage area. The site will be fully improved with new utility connections, concrete aprons, asphalt pavement patching/replacement, landscaping, exterior stairs and ramp, etc. Demolition of the existing concession building and other site related demolition is to be included as shown on the plans. Refer also to Instructions To Bidders; Section 3 – Scope of Work, in this Project Manual. Colonel John Wheeler Middle School - New Hockey Locker / Concession Facility and Related Work. 401 West Joliet St. Crown Point, IN 46307 All work for the complete construction of the Project will be under one or more prime contracts with the Owner based on bids received and on combinations awarded. The Construction Manager will manage the construction of the Project. Construction shall be in full accordance with the Bidding Documents, which are on file with the Owner and may be examined by prospective bidders at the following locations: Professional Building Services, Inc. 111 1/2 West Joliet Street Crown Point, IN 46307 Bid security in the amount of ten percent (10%) of the Bid must accompany each Bid in accordance with the Instructions to Bidders. The successful Bidders will be required to furnish Performance and Payment Bonds for one hundred percent (100%) of their Contract amount prior to execution of Contracts. Contractors submitting bids for the performance of any Work as specified in this building Project should make such Bids to Crown Point Community School Corporation. Contractors are advised that the Contract as finally entered into with any successful Bidder may be entered into with either the School Corporation or the Building Corporation or certain portions of the Contract may be entered into by both the School Corporation and the Building Corporation. The Owner reserves the right to accept or reject any Bid (and to waive any irregularities in bidding. All Bids may be held for a period not to exceed 60 days before awarding contracts.

Details

2 Stories Above Grade, 6,300 SF.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents