Similar Projects
Last Updated | 10/14/2022 03:31 PM |
Project Title | Performance contract for energy Conservation & facility improvement projects |
Physical Address | View project details and contacts |
City, State (County) | Wilmington, IL 60481 (Will County) |
Category(s) | Education |
Sub-Category(s) | Middle/Senior High School |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $300,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Replacement of the heating and air conditioning systems and associated work at L.J. Stevens Intermediate School along with any resulting, necessary asbestos abatement or pipe/ceiling replacement. The district plans to select the most qualified contractor for the purpose of negotiating a final contract. A letter of intent (LOI) will be issued to the selected qualified contractor. All questions about the RFP are required to be sent via email (not phone) to Matt Swick. Potential respondents shall not call or contact any other representative from the district directly. An architectural and engineering review of the RFP responses will be completed by Healy Bender Patton & Been Architects. The final scope including definition, drawings, specifications, and permits are the sole responsibility of any selected ESCO. The district reserves the right to request changes to the ESCO's proposed scope of work, drawings, specifications, etc. based upon the results of the architectural and engineering review during the evaluation and review of proposals time period and/or during the contract negotiation period. The district also reserves the right to seek input and guidance from Healy Bender Patton & Been Architects throughout the entirety of the project. As a part of any submitted RFP response received contractors will provide the following information to be reviewed by Healy Bender Patton Been Architects and district officials Schematic drawings Letter detailing the scope of work Specifications and equipment submit |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |