Similar Projects
Paving Work
Infrastructure
Bidding
Milwaukee, WI 53274

Streetscape Materials
Post-Bid
Milwaukee, WI 53202

Parking Lot Renovation
Post-Bid
Milwaukee, WI 53205

Asphalt Pavement Resurfacing, Replace Curb and Gutter, Sidewalk and Driveway Approaches
Results
Milwaukee, WI 53202

Grant Park North Access Roads/Parking Lots Reconstruction
Results
South Milwaukee, WI 53172

Burnham Pointe Park
Post-Bid
Less than $231,532 est. value
West Allis, WI

ADA Ramps for High Impact Paving Northside
Results
Milwaukee, WI 53288

Area Wide Sidewalk Replacement
Infrastructure
Post-Bid
Milwaukee, West Allis, WI 53288

Sidewalk High Impact Paving Work
Results
Milwaukee, WI

68th Street Improvement
Infrastructure
Post-Bid
Wauwatosa, WI

Sidewalk High Impact Paving
Results
Milwaukee, WI 53288

Asphalt Pavement Resurfacing, Replace Curb and Gutter, Sidewalk and Driveway Approaches Where Necessary
Infrastructure
Post-Bid
Milwaukee, WI

2021 Sidewalk Improvement Program
Results
$75,000 est. value
Milwaukee, WI

Administrative Facilities New Asphalt, Pavement, Sidewalks,Concrete Stairs, and New Loading Docks
Infrastructure
Post-Bid
Milwaukee, WI

2021 Sidewalk Improvements
Results
Less than $288,500 est. value
Shorewood, WI 53211

Last Updated 07/31/2021 10:40 AM
Project Title

Municipal Parking Lots

Physical Address View project details and contacts
City, State (County) West Allis, WI 53214   (Milwaukee County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $678,900
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of Bioretention Devices, Permeable Interlocking Concrete Pavement Systems, 4” asphalt pavement over 8” dense graded base course, curb and gutter replacement, miscellaneous concrete sidewalk, concrete driveway approaches, storm sewer and storm inlet replacement, light poles, and landscaping as described in the plans and specifications. South 71st Street to South 72nd Street and West Greenfield Avenue to West Orchard Street and South 73rd Street to South 74th Street and West Greenfield Avenue to West Orchard Street

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents