Similar Projects
HVAC and Mechanical Products
Term Contract
Bidding

HVAC and Mechanical Products and Solutions
Term Contract
Bidding

Maintenance and Repair Services on HVAC
Post-Bid
Arlington, Fort Belvoir, VA 22060

Maintenance and Repair Services for Fume Hoods/Controllers
Post-Bid
Annandale, VA 22003

Replacement of 7.5 Ton HVAC Unit Project
Results
$28,000 est. value
VA

Rooftop Air Handling Unit Replacements at Chantilly High School
Results
Chantilly, VA 20151

Air Purification Systems
Post-Bid
Chatham, Pound, Victoria, VA 23936

Rooftop Unit and Condensing Unit Replacements at Bull Run Elementary School
Results
Centreville, VA 20121

Armstrong SF665DW Heater Replacement Parts
Post-Bid

Fenwick Hall Tower ā€œCā€ Air Handler Unit (AHU) and Motor Control Center (MCC) Replacement
Results
Fairfax, VA

Unit Ventilator and Condensing Unit Replacements at Daniels Run Elementary School
Results
Fairfax, VA 22030

Franklin Sherman Elementary School Modifications to Rooftop Units
Results
McLean, VA 22101

Mechanical /Plumbing/HVAC Services
Term Contract
Results
Alexandria, Annandale, Manassas, Springfield, Sterling, Woodbridge, VA

Replacement of 2 Air Handling Units
Results
Falls Church, VA

HVAC Filters MERV 13
Term Contract
Results
Falls Church, VA 22042

Last Updated 05/10/2021 10:35 AM
Project Title

Meadowlark Botanical Gardens Atrium Rooftop Equipment Replacement

Physical Address View project details and contacts
City, State (County) Vienna, VA 22182   (Fairfax County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $400,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes replacement of existing rooftop HVAC equipment, associated duct and electrical work. In the flat roof area, the project includes replacement of existing membrane roofing, associated flashing and penetration protection and extension of equipment curb. In the standing seam metal roof area, replacement of penetration protection, replacement of gutter liner and replacement of roof drain covers are included.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents