Similar Projects
Bogert Place - Church to Story Street - SCR26 - City of Bozeman
Infrastructure
Conception
$402,000 est. value
Bozeman, MT 59715

Griffin (7th to Rouse) - Construction - SIF113 - City of Bozeman
Infrastructure
Conception
$2,700,000 CJ est. value
Bozeman, MT 59715

Phase 1 Collection System Rehabilitation
Infrastructure
Design
$1,950,000 CJ est. value
Glendive, MT 59330

4th Avenue West and 2nd Street West Improvements
Infrastructure
Design
$2,000,000 CJ est. value
Polson, MT 59860

Gore Hill Water System Improvements
Infrastructure
Bidding
$2,238,375 CJ est. value
Great Falls, MT 59401

Raw Water Intake, Pump Station, and Pipeline
New Construction, Infrastructure, Renovation
Bidding
$50,000 CJ est. value
Fort Smith, MT 59035

Scrub Seal Fog Seal East of Brady East Great Falls Area
Infrastructure
Post-Bid
Great Falls, MT

Replace 2 Structures, Grading, Gravel, Pms Overlay, Sidewalk, Curb/Gutter And Guardrail On The Beaver Creek-Wibaux 1 Mile s Wibaux Project Located In Wibaux County
Infrastructure
Post-Bid
MT

Hudson Bay Divide South
Infrastructure
Results

Hudson Bay Divide South
Infrastructure
Results

Taft Stockpile Site - Sand/Salt Cover Structure
New Construction, Infrastructure
Construction
$310,000 CJ est. value
Taft, MT 59867

Milky Way Drive Multi-Residential Development
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Bozeman, MT 59718

Research Labs and Wool Lab - Montana Agricultural Experiment Stations
New Construction, Infrastructure
Pending Verification
$11,000,000 CJ est. value
Bozeman, MT 59715

Story Mill (Griffin to Bridger) Construction - SIF117 - City of Bozeman
Infrastructure
Conception
$250,000 CJ est. value
Bozeman, MT 59715

Tschache Apartments
New Construction, Infrastructure - 74,598 SF
Design
$13,500,000 CJ est. value
Bozeman, MT 59715

Last Updated 08/11/2022 12:01 PM
Project Title

2022 Street Improvement Project

Physical Address View project details and contacts
City, State (County) Lewistown, MT 59457   (Fergus County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $615,307 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

**As of August 11, 2022, project was awarded to MT Paving , awarded amount is $615,306.50** The City of Lewistown Public Works Department is requesting bids for the 2022 Street Improvement Project. BID SECURITY Each Bid shall be accompanied by Bid Security made payable to OWNER in an amount of ten percent (10%) of the Bidder's maximum Bid price and in the form of cash, a cashier's check, certified check, bank money order, or bank draft, in any case drawn and issued by a national banking association located in Montana or by any banking cor- poration incorporated under the laws of Montana; or a Bid Bond issued by a surety authorized to do business in Montana. Bid Bonds shall be countersigned by a Resident Montana Agent. The City of Lewistown reserves to right to reject any or all bids as they deem to be in their best interest

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents