Similar Projects
Shepherdstown Middle School Roof Replacement
Bidding
Shepherdstown, WV 25443

South Jefferson Elementary School Roof Replacement
Bidding
Charles Town, WV 25414

Carter Hall and Van Meter Roof Replacement
Post-Bid
Morgantown, WV 26506

Simms School Elderly Apartment Roofing and Facade Historic Reconstruction and Restoration
Post-Bid
Huntington, WV

Ranson City Hall Roof Replacement
Results
Ranson, WV 25438

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Blue Ridge Elementary School Roof Replacement
Bidding
Harpers Ferry, WV 25425

Roofing Envelope Services
Post-Bid

Student Center Roof Replacement
Results
Shepherdstown, WV 25443

Roof Replacement
Bidding
Charles Town, WV 25414

Hardway Hall and Hunt Haught Hall - Roof Renewals
Post-Bid
Fairmont, WV

Knutti Hall Roof and Foundation Improvements
Results
Shepherdstown, WV 25443

Roof Replacement at Marshall University
Bidding
Huntington, WV 25704

Roofing MACC
Post-Bid

Roof Replacement Project at Ranson Elementary School
Results
Ranson, WV 25438

Reported 03/27/2021 12:00 AM
Project Title

Roof Replacement at the ADA Wastewater Treatment Plant Garage

Physical Address View project details and contacts
City, State (County) Bluefield, WV   (Mercer County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Sanitary Board of Bluefield is soliciting proposals for a Roof Replacement at the Ada Wastewater Treatment Plant Garage. The basic specifications are as follows: — Install new flute fill EPS insulation in the existing metal panel flutes – insulation to be 1¼” thick — Mechanically attach new ½” HD Polyiso insulation cover board (80PSI, R-value of 3) — Install a fully adhered .060? EPDM roof system – all details, flashing specs and terminations per manufacturer’s specifications — Fabricate ad install new edge made from 24 gauge Kynar finished steel. New edge metal to comply with ANSI-SPRI ES-1 details — Fabricate and install new gutters and downspouts made from 24 guage Kynar finished. New gutter to complete with current SMACNA details — Provide a manufacturer’s 15 year labor and material warranty upon completion — Acceptable manufacturer’s: Carlisle, Firestone, or state approved equal. The proposal is to include specifications from the proposed material manufacturer regarding the materials to be installed and their installation requirements, a schedule defining the overall length of the project and an estimated time from proposal acceptance to initiating the work to be performed.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents