Similar Projects
Reported | 03/27/2021 12:00 AM |
Project Title | Roof Replacement at the ADA Wastewater Treatment Plant Garage |
Physical Address | View project details and contacts |
City, State (County) | Bluefield, WV (Mercer County) |
Category(s) | Single Trades |
Sub-Category(s) | Roofing |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFPs) |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Sanitary Board of Bluefield is soliciting proposals for a Roof Replacement at the Ada Wastewater Treatment Plant Garage. The basic specifications are as follows: — Install new flute fill EPS insulation in the existing metal panel flutes – insulation to be 1¼” thick — Mechanically attach new ½” HD Polyiso insulation cover board (80PSI, R-value of 3) — Install a fully adhered .060? EPDM roof system – all details, flashing specs and terminations per manufacturer’s specifications — Fabricate ad install new edge made from 24 gauge Kynar finished steel. New edge metal to comply with ANSI-SPRI ES-1 details — Fabricate and install new gutters and downspouts made from 24 guage Kynar finished. New gutter to complete with current SMACNA details — Provide a manufacturer’s 15 year labor and material warranty upon completion — Acceptable manufacturer’s: Carlisle, Firestone, or state approved equal. The proposal is to include specifications from the proposed material manufacturer regarding the materials to be installed and their installation requirements, a schedule defining the overall length of the project and an estimated time from proposal acceptance to initiating the work to be performed. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |