Similar Projects
Reported | 05/28/2022 12:00 AM |
Project Title | Construction Management at Risk Services for 44th Avenue East from I-75 to Lakewood Ranch Blvd and East Lake Expansion Project |
Physical Address | View project details and contacts |
City, State (County) | Bradenton, FL 34211 (Manatee County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. Construction Management - CM at Risk. |
Project Status | Accepting Qualifications |
Bids Due | View project details and contacts |
Estimated Value | $68,000,000 |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The 44th Avenue East - I-75 to Lakewood Ranch Blvd and SEWRF East Lake Expansion project includes construction of approximately 1.6 miles of a new 4-lane divided roadway extension of 44th Avenue East from west of Interstate 75 to Solutions Lane, west of Lakewood Ranch Blvd. Included in this extension of 44th Avenue East is a 380-foot long bridge structure over I-75, approximately 1,700 feet of causeway within the existing County-owned reclaimed water storage lake, a roundabout at the intersection of Lena Road, sidewalks, bike lanes/multi-use path, street lighting, ATMS, stormwater management, drainage systems, underground water and sewer utilities, and other improvements as shown in the construction plans. Approximately 1,400 feet of 2-lane divided roadway with sidewalks, multi-use path, street lighting, stormwater management, drainage systems, and other improvements, as shown in the plans, will be constructed to connect 44th Avenue East to the existing Lena Road located to the south. An offsite wetland mitigation site will be constructed at the County-owned Hidden Harbor Park that is located on the north side of the Bradenton River, immediately adjacent to the east side of the Fort Hamer bridge. Lastly, the existing County-owned SEWRF East Lake reclaimed storage lake will be expanded and will provide a source of fill material for this project as well as additional reclaimed water storage volume for the SEWRF. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |